Laserfiche WebLink
3. Incorporate comments from DDW/OCHCA into the Engineering Reports to obtain <br />approval. <br />Task 4.1.7 - General Engineering Support <br />Provide general engineering support. Assume 8 hours. <br />Task 4.1.8 - Construction Oversight <br />1. Oversee retrofit construction <br />Oversee retrofit construction work by Contractor, coordinate with site owner & <br />Contractor to achieve compliance with recycled water regulations and document <br />progress with field notes / photographs. This will include obtaining GPS coordinates <br />for the potable water meter, recycled water meter, irrigation control valve boxes, quick <br />couplers, hose bibbs, and other related appurtenances. <br />2. DDW and OCHCA Coordination Meetings <br />Arrange and attend meeting(s) with the owner, City, DDW and or OCHCA to address <br />issues as they arise during construction. Assume two (2) meetings at 2 hours each. <br />Task 4.1.9 - Final Cross Connection Testing <br />Participate in the final cross connection testing with DDW, OCHCA, and City <br />representation to obtain final project approval. <br />Task 4.1.10 - Facilitate Grant Application (Optional Task) <br />Assist the site owner with application for Metropolitan Water District of Southern <br />California's On -Site Retrofit Program (http://www.bewaterwise.com/on-site-retrofit- <br />program.html). <br />City of Santa Ana Recycled Water Master Plan — Amendment No. 1 <br />Exhibit P a g e 14 <br />