Laserfiche WebLink
C .6uulbn Manapa(s, ConnulNg Prg!/reun <br />EDUCATION <br />B. S., Civil Engineering <br />California Polytechnic <br />University, San Luis <br />Obispo, 1982 <br />LICENSES / <br />CERTIFICATIONS <br />Engineer -In -Training, <br />California, #54215, 1982 <br />AREAS OF <br />EXPERTISE <br />Construction <br />Management <br />Program Management <br />Contract Bidding <br />Value Engineering <br />Environmental <br />Compliance <br />Water/Wastewater <br />Design Team Builder <br />Land Development <br />Transportation <br />Accounting Interface <br />DEDICATED TO <br />PROJECT <br />As -Needed <br />Principal -in -Charge <br />Professional Summary <br />Mr. Joseph Blum has over 35 years of experience designing, managing and <br />estimating the construction and reconstruction of heavy civil engineering <br />projects. Projects include earth moving, mass grading, city and county road <br />construction, highways, bridges, paving, drainage, large and small diameter <br />pipelines, wetlands, recharge basins, reservoirs, concrete structures, and wet <br />and dry utilities. In addition, his construction experience includes flood control <br />facility, blasting, and screening. <br />Mr. Blum has comprehensive experience in all aspects of due diligence <br />analysis, management of design engineering, project development, and <br />execution. These aspects include planning, environmental permitting, <br />engineering, acting as governmental liaison, transportation programs, street <br />improvements, dry and wet utility planning and construction, sewer/water <br />entitlements, CFD formation and execution, and bond exoneration. He is a <br />proven team leader, team organizer, and team player. <br />Responsibilities and capabilities range from overall field construction to day- <br />to-day project management, estimating, constructability review, contract <br />administration, business development, and operations. <br />Relevant Experience <br />Project Manager, Simon Ranch Reservoir, Booster Pump Station, and <br />Pipeline Replacement Project; Santa Ana, CA; City of Tustin (Duration: <br />0312020 — 0812021; Value: $12.6 million) —Mr. Blum is performing as the <br />Project Manager for the replacement of Simon Ranch Reservoir. The scope <br />of work includes the following: demolition and removal of the existing <br />reservoir at Valhalla Drive and Outlook Lane; replacement of the existing <br />reservoir with a 1.0 MG circular prestressed concrete tank; replacement of <br />existing 4", 6", and 8" pipelines with new and upsized pipes; pipeline <br />replacement in Simon Ranch Road, Valhalla Drive, Racquet Hill, Via Rancho, <br />and Vista Mar; construction of 400 feet of 16-inch, 1,900 feet of 12-inch, and <br />200 feet of 8-inch Zone 3 piping, as well as 5 new fire hydrants; construction <br />of a new booster pump station at the reservoir site; replacement of asphalt at <br />Valhalla and Outlook; and grading and shoring operations. <br />Project Manager, Peters Canyon Channel Improvements (CIP No. <br />50040), City of Tustin, Department of Public Works; Tustin and Irvine, <br />CA (Completion: March 2020; Value: $13,031,662)—Mr. Blum provided <br />project management services for the Peters Canyon Channel Improvements <br />Project. The channel work included demolition, widening, and relining <br />approximately 5,000 feet of the existing channel within the Cities of Tustin <br />and Irvine from north of Edinger Avenue to Warner Avenue. The channel <br />scope of work also included construction of new storm drain lines, extension <br />of existing storm drain lines, and road undercrossings. Butier staff <br />coordinated with the City of Irvine, Irvine Ranch Water District, Orange <br />County Flood Control District, Southern California Gas Co., and Southern <br />California Edison. <br />