UTIER <br />Joseph C. Blum <br />Principal -in -Charge <br />the Armstrong/Warner Ave. Extension Phase 2 project, which is a part of <br />Tustin Legacy. The scope of work included roadway improvements, traffic <br />signals, landscape, dry utility, waterline, and reclaimed water and sewer line <br />construction on the following streets: Armstrong Avenue Extension from <br />Warner Avenue to Barranca Parkway and Warner Avenue Extension from <br />Red Hill Avenue to Tustin Ranch Road. Mr. Blum assisted the City with <br />developing the required PERF documentation to submit to the Department of <br />the Navy for approval. <br />Oso Parkway Roadway Improvements; Mission Viejo/Rancho Santa <br />Margarita, CA (County of Orange) —Roadway improvements included <br />approximately 19,536 LF (120 ft. wide right-of-way), including right-of-way <br />acquisition with land owners, rough and fine grading of the road, installation <br />of storm drain facilities, sewer water facilities, joint trench facilities, ranch <br />fencing, signing and striping, and erosion control for two winters. In addition, <br />Mr. Blum managed the design and entitlement process through <br />environmental and jurisdictional agencies. (Value: $13 million) <br />Alton Parkway Roadway Improvements between Interstate 6 and <br />Muirlands Blvd./Barranca Parkway; Irvine, CA (The Irvine Company) — <br />Roadway improvements included approximately 11,100 LF (120 ft. wide right- <br />of-way), including right-of-way acquisition with land owners and the MCAS El <br />Toro Marine Base, rough and fine grading of the road, installation of storm <br />drain facilities, sewer water facilities, joint trench facilities, ranch fencing, <br />signing and striping, concrete farm equipment crossings, and erosion control <br />for two winters. (Value: $9.5 million) <br />Bake Parkway Roadway Improvements between Trabuco RoadlIrvine <br />Blvd. and Portola Parkway; Lake Forest/Foothill Ranch, CA (Baldwin <br />Company)—Portola Parkway North to El Toro Road. Roadway improvements <br />included approximately 9,500 LF (130 ft. wide right-of-way), including right-of- <br />way acquisition with 7 land owners, rough and fine grading of the road, <br />installation of storm drain facilities, sewer water facilities, joint trench facilities, <br />signing and striping, and erosion control for two winters. (Value: $6.5 million) <br />16,000 LF of Road Improvements for Norco Hills Project; Norco, CA <br />(City of Norco) CFD 2001-01 Public Funds, 2003 and 2004—Design and <br />construction management of grading plans, storm drain, sewer and water, <br />curb and gutter, joint trench and paving for 16,000 LF of road improvements <br />within the Norco Hills Project for the City of Norco. The scope of work <br />included installation of 30-inch to 72-inch RCP for drainage; first flush basins; <br />12-inch to 15-inch trunk sewer; 8-inch to 16-inch water mains; water booster <br />pump station; two (2) 660,000-gallon storage tanks; and curb, gutter and <br />paving. (Value $33 million) <br />