								    UTIER 
<br />Joseph C. Blum 
<br />Principal -in -Charge 
<br />the Armstrong/Warner Ave. Extension Phase 2 project, which is a part of 
<br />Tustin Legacy. The scope of work included roadway improvements, traffic 
<br />signals, landscape, dry utility, waterline, and reclaimed water and sewer line 
<br />construction on the following streets: Armstrong Avenue Extension from 
<br />Warner Avenue to Barranca Parkway and Warner Avenue Extension from 
<br />Red Hill Avenue to Tustin Ranch Road. Mr. Blum assisted the City with 
<br />developing the required PERF documentation to submit to the Department of 
<br />the Navy for approval. 
<br />Oso Parkway Roadway Improvements; Mission Viejo/Rancho Santa 
<br />Margarita, CA (County of Orange) —Roadway improvements included 
<br />approximately 19,536 LF (120 ft. wide right-of-way), including right-of-way 
<br />acquisition with land owners, rough and fine grading of the road, installation 
<br />of storm drain facilities, sewer water facilities, joint trench facilities, ranch 
<br />fencing, signing and striping, and erosion control for two winters. In addition, 
<br />Mr. Blum managed the design and entitlement process through 
<br />environmental and jurisdictional agencies. (Value: $13 million) 
<br />Alton Parkway Roadway Improvements between Interstate 6 and 
<br />Muirlands Blvd./Barranca Parkway; Irvine, CA (The Irvine Company) — 
<br />Roadway improvements included approximately 11,100 LF (120 ft. wide right- 
<br />of-way), including right-of-way acquisition with land owners and the MCAS El 
<br />Toro Marine Base, rough and fine grading of the road, installation of storm 
<br />drain facilities, sewer water facilities, joint trench facilities, ranch fencing, 
<br />signing and striping, concrete farm equipment crossings, and erosion control 
<br />for two winters. (Value: $9.5 million) 
<br />Bake Parkway Roadway Improvements between Trabuco RoadlIrvine 
<br />Blvd. and Portola Parkway; Lake Forest/Foothill Ranch, CA (Baldwin 
<br />Company)—Portola Parkway North to El Toro Road. Roadway improvements 
<br />included approximately 9,500 LF (130 ft. wide right-of-way), including right-of- 
<br />way acquisition with 7 land owners, rough and fine grading of the road, 
<br />installation of storm drain facilities, sewer water facilities, joint trench facilities, 
<br />signing and striping, and erosion control for two winters. (Value: $6.5 million) 
<br />16,000 LF of Road Improvements for Norco Hills Project; Norco, CA 
<br />(City of Norco) CFD 2001-01 Public Funds, 2003 and 2004—Design and 
<br />construction management of grading plans, storm drain, sewer and water, 
<br />curb and gutter, joint trench and paving for 16,000 LF of road improvements 
<br />within the Norco Hills Project for the City of Norco. The scope of work 
<br />included installation of 30-inch to 72-inch RCP for drainage; first flush basins; 
<br />12-inch to 15-inch trunk sewer; 8-inch to 16-inch water mains; water booster 
<br />pump station; two (2) 660,000-gallon storage tanks; and curb, gutter and 
<br />paving. (Value $33 million) 