Laserfiche WebLink
TIE! <br />Consbucrtun Managers. Consnlrtng Engrnaurs <br />EDUCATION <br />M.S., Construction <br />Management, University <br />of Southern California, <br />Los Angeles, California, <br />2003 <br />B.S., Civil Engineering, <br />California State <br />Polytechnic University — <br />Pomona, California, 1995 <br />LICENSES / <br />CERTIFICATIONS <br />Professional Civil <br />Engineer, State of <br />California, <br />No. CE59405, <br />Exp,12/31/21 <br />AFFILIATIONS <br />Project Management <br />Institute <br />Building Industry <br />Association, Orange <br />County Chapter <br />Urban Land Institute <br />DEDICATED TO <br />PROJECT <br />As -Needed <br />Vladimir Burce, P.E. <br />Technical Advisor <br />Professional Summary <br />Mr. Burce is a registered civil engineer with over 25 years of professional <br />experience in project and construction management, including planning, <br />design, resource allocation, and cost/schedule management of major <br />projects. He has extensive experience in providing PM and CM services for <br />water/wastewater treatment facilities, wells, pump stations, storm water <br />detention / retention systems, transportation, parking structures, industrial, <br />educational, residential, and land development projects during the design and <br />construction phases. <br />Mr. Burce has diverse project experience in public works and real estate <br />development. This background provides him with an in-depth understanding <br />of civil engineering disciplines. His professional responsibilities have ranged <br />from feasibility study, geotechnical, civil design, complex drainage design and <br />regulatory requirements, technical specifications development and <br />preparation of bid documents, design/constructability review, schedule <br />preparation, field implementation and supervision, and construction <br />management. <br />Project Experience <br />Resident Engineer, San Lorenzo Sewer Lift Station; Santa Ana, CA; City <br />of Santa Ana, Public Works (Completion: 0612021; Value: $7.6 million) — <br />The San Lorenzo Sewage Lift Station Project consists of construction of the <br />following: lift station —below ground dry and wet wells; aboveground CMU <br />block building; three (3) 15 hp dry pit sewage pumps; piping, fittings, valves, <br />flow meter, in -line grinders, rail and hoist system; HVAC, ventilation and <br />ducting; electrical and instrumentation; site grading and improvements; 560 <br />(LF) of 15" gravity sewer pipe; 190 (LF) of 12" gravity sewer pipe; 545 (LF) of <br />10" force main; sewer manholes and appurtenances; and abandonment of <br />existing Segerstrom Lift Station. <br />Resident Engineer, Mid -Basin Injection: Centennial Park Project; Santa <br />Ana, CA; Orange County Water District (Completion: 03/2020; Value: <br />$29.6 million) —The Mid -Basin Injection project consisted of the construction <br />of the following: four groundwater injection wells in below grade vaults; two <br />(2) monitoring wells; a purified recycled water injection supply pipeline <br />approximately 5,700 feet long that connects to the District's existing <br />Groundwater Replenishment System (GWRS) pipeline and crosses the Santa <br />Ana River; a backflush discharge pipeline approximately 4,200 feet long that <br />discharges to the Greenville -Banning Channel and Centennial Park Lake; <br />installation of submersible pumps within the four injection wells; replacement <br />of approximately 9.6 acres of paving within the Park; demolishing an existing <br />City of Santa Ana restroom facility; and constructing two new buildings with <br />shared City and District uses. Mr. Burce coordinated closely with the City <br />of Santa Ana, Santa Ana Unified School District, Heritage Museum, and <br />state and federal agencies. <br />Resident Engineer, Ridgeline Booster Pump Station 2 Project; Lake <br />Forest, CA; Trabuco Canyon Water District (Duration: 07/24/19 — <br />03127120; Value: $2,073,600) — The Butler Team is providing resident <br />