My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BUTIER ENGINEERING
Clerk
>
Contracts / Agreements
>
B
>
BUTIER ENGINEERING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2021 5:38:47 PM
Creation date
2/4/2021 5:36:55 PM
Metadata
Fields
Template:
Contracts
Company Name
BUTIER ENGINEERING
Contract #
A-2021-005
Agency
Public Works
Council Approval Date
1/19/2021
Expiration Date
1/18/2024
Insurance Exp Date
1/1/1900
Destruction Year
2029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ConsBoeUon Managers. GonaulUng Eng(naors <br />Ryan Weir <br />Contract Administrator <br />roadway construction; street and landscape improvements; utility <br />construction; domestic and recycled water; dry utilities; aesthetic treatments; <br />construction of barriers, sidewalks, wing -walls, foundation, and railings; <br />structure excavation; backfill; and drainage. <br />Field Engineer / Document Controls, Moffett Drive and Legacy Road <br />Extension, TUSD School Site and City Property Grading; City of Tustin, <br />Public Works (Completion: 2018)—The project site is located in the Tustin <br />Legacy development at the Moffett Drive roadway extension from future <br />Legacy Road to Tustin Ranch Road; Legacy Road roadway extension from <br />Valencia Avenue to future Moffett Drive; TUSD School site at the SW corner <br />of Valencia Avenue and Tustin Ranch Road; and City Property adjacent to <br />TUSD School site and Tustin Ranch Road. The project included performing <br />soils removal and recompaction, excavation, stabilization, and placement of <br />fill within the project site. Grading work included the finishing of undercuts of <br />streets and parkway grading, erosion and sediment control, installations of <br />basins, storm drain, and drainage structures, construction of channels and <br />swales and protection -in -place and/or demolition of IRWD facilities. <br />Document Control Specialist; Moffett Drive and Park Avenue Roadway <br />Extension Project; City of Tustin, Public Works (Completion: 2016; <br />Value: $14.5 million) —The project included the removal and compaction of <br />approximately 250,000 CY of removal and compaction of soil; 275,000 SF of <br />subgrade preparation and street fine grading; and 4,000 LF of reinforced <br />concrete box storm drain. The project also included the construction of street <br />improvements, paving, utility installation, signing, traffic installation, <br />landscaping, and irrigation. Approximately 15,000 CY of concrete was used <br />to construct the reinforced concrete box storm drain, which included lateral <br />storm drains with catch basins. Major dewatering efforts and shoring under <br />the Jamboree Bridge at Moffett Drive presented significant challenges that <br />Butier coordinated with success. <br />Butler staff coordinated with several agencies, including the City of Tustin; <br />Irvine Ranch Water District for installation of reclaimed and domestic <br />waterlines; County of Orange; and Department of the Navy. The construction <br />of the project continues to provide service for the backbone of the Tustin <br />Legacy Project which is a 1,600-acre residential and commercial <br />development on the location of the retired Marine Corps Air Station. <br />Field Engineer / Document Controls, Edinger Avenue Well —Phase II <br />Equipping Project; City of Tustin, Public Works (Completion: 2016; <br />Value: $4,103,650)—Butier provided construction management and <br />inspection services for the Edinger Avenue Well - Phase II Equipping Project. <br />Construction of the building and equipping of the pump included installation of <br />a 225 LF of 12-inch diameter CML ductile iron pipe discharge water line; <br />connection to 12-inch ductile iron watermain; installation of 162 LF of 18-inch <br />diameter C-905 drain line; connection to the existing storm drain; placement <br />of new onsite sewer manhole; installation of 76 LF of 8-inch diameter SDR 26 <br />sewer lateral; and connection to existing OCSD sewer manhole. The scope of <br />work also included the erection of 2,376 SF of CMU block wall with a metal <br />roof building to enclose the well pump, electrical equipment and chlorine <br />
The URL can be used to link to this page
Your browser does not support the video tag.