My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BUTIER ENGINEERING
Clerk
>
Contracts / Agreements
>
B
>
BUTIER ENGINEERING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2021 5:38:47 PM
Creation date
2/4/2021 5:36:55 PM
Metadata
Fields
Template:
Contracts
Company Name
BUTIER ENGINEERING
Contract #
A-2021-005
Agency
Public Works
Council Approval Date
1/19/2021
Expiration Date
1/18/2024
Insurance Exp Date
1/1/1900
Destruction Year
2029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />City of Santa Ana, Public Works Agency <br />South Main Corridor Improvements Project <br />Construction Management and Inspection Services, RFP No. 20-115 <br />1. Construction Progress Reports <br />The PM will prepare monthly progress reports <br />that will include the following items: summary of <br />the prior month's main accomplishments and <br />current construction activities; reconciliation of <br />contract time, work progress, and manpower <br />usage by the Contractor; project costs to date; <br />overall contractor's conformance to quality <br />requirements; identification of major issues <br />addressed or arising from the project requiring <br />resolution; summary of progress payments, <br />certified payrolls, change order disputes, <br />submittals, RFis and responses, and notices of <br />noncompliance; and daily photographs of <br />representative project activities. <br />2. Weekly Progress Meetings <br />The PM will schedule and lead weekly <br />meetings with the Contractor, the City's <br />assigned Construction Manager, and other <br />representatives to resolve all project matters <br />and assess responsibilities for response to <br />respective participants. The PM will implement <br />action monitoring to ensure compliance and <br />timely response. The CA will distribute the <br />minutes to the attendees within two working <br />days and include the minutes in the monthly <br />progress reports. <br />3. Shop Drawings and Submittals <br />The Butier Team will be responsible for <br />processing and monitoring the status of <br />submittals. In meeting the City's internal <br />timeframes, submittals will be processed on a <br />one -week turnaround basis or sooner. <br />Submittal tracking will be introduced into the <br />electronic document control system and status <br />of submittals will be known at all times. This <br />system will be coordinated with the Contractor <br />per contract document requirements. The PM <br />will review the completeness and quantity of <br />all required shop drawings, product data, <br />samples and other submittals received during <br />the construction phase and transmit to City <br />staffing for review and approval. <br />4. Requests for Information <br />The PM will coordinate the RFI review <br />process and route all RFIs to the appropriate <br />reviewer. The documentation will be logged, <br />tracked, maintained, and organized in the <br />electronic document control system in PDF <br />format. All responses will be monitored with <br />suspense action dates and follow-up <br />procedures implemented to ensure timely <br />action by all parties to project issues including <br />input from City staff. <br />5. Permits <br />The Butier Team will verify that the contractor <br />has secured all building permits and special <br />permits required by the contact documents. <br />6. Change Order Requests <br />The City or Contractor may initiate a change <br />or request for changes, or modifications may <br />arise due to differing site conditions. The PM <br />will track, document, and negotiate all <br />changes for added costs or credits with the <br />Contractor. The PM will evaluate all schedule <br />impacts in addition to advising the District of <br />equitable cost and time adjustments for <br />proposed or authorized changes including <br />credits that are due. <br />The PM will coordinate change order <br />procedures for preparation of documents to be <br />executed by the Contractor and the District. <br />The RE and claims support will evaluate <br />Contractor claims seeking additional costs or <br />time for contract modifications. <br />The PM will assess if the claim has merit and <br />make recommendations. Unresolved claims <br />will be administered through the remedies <br />clauses of the construction contract under the <br />direction of the City. <br />7. Contractor's Safety Program <br />The Contractor will be required to prepare and <br />submit a safety program to the City. The <br />contractor is responsible for site safety. <br />The CM team will periodically attend the <br />contractors site safety meetings to validate the <br />submitted plan is being monitored. <br />8. Cost Accounting Records <br />The Butler Team will maintain cost accounting <br />records on authorized work performed under <br />unit costs and additional work performed <br />1BUTIER,� - F. SCOPE OF SERVICES & SCHEDULE <br />
The URL can be used to link to this page
Your browser does not support the video tag.