Laserfiche WebLink
CITY OF SANTA ANA <br />(PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ODDER <br />Project Number Pro)apt No. 17.9001 South M81n Street Corridor Improvements Change Order Number 8 <br />To _ C.S Legacy Construction Inc. <br />Contrector <br />You are hereby directed to make the herrin changes from the plena and specifications or do the following dascrlhed work not Included In the plans and <br />spe9dlcations pn this conlmci. <br />NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY <br />Unless.Dthernlss stated, rates for rental of equipment cover only such time as equlpmont Is ritually u'sdd and no allowance wUl he made for Idle time, <br />Change requested by <br />PUBLIC WORKS AGENCY <br />EXTRA WORK AT AMEED PRICE UNIT PRICE <br />3. Due to existing utility conflicts, the sewer main profile between Myrtle Avenue and First <br />Str2s4:Wa5 IoWered with additional excavation of material and backfill with approved backfill <br />marke, �l.(PCO#21) <br />TOTAL AGrteleo PRtca = $23,245.0TIAL <br />41.11 City requested additional curb and gutter.along Bishop Street requiring the use of trench <br />plates'to maintain access to local business. (PCO #22) <br />_TQTAL AGREED PRICE =.49 <br />I ITIAL <br />5. An abandoned traffic signal / street light footing uncovered during the Installation of the <br />McFadden intersection ADA. ramp required partial removal of footing to complete the <br />Installation of the ramp. (PCO #23) <br />TQTAL. AGREED PRICE 7TI <br />` <br />Page 2 of 4 <br />