My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C.S. LEGACY CONSTRUCTION, INC. (2)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
C.S. LEGACY CONSTRUCTION, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2025 9:50:34 AM
Creation date
2/10/2021 5:50:33 PM
Metadata
Fields
Template:
Contracts
Company Name
C.S. LEGACY CONSTRUCTION, INC.
Contract #
P 17-9001, 18-6911
Agency
Public Works
Council Approval Date
1/19/2021
Expiration Date
12/4/2023
Notes
20-6958, 21-6451, 19-6940
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />(PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ODDER <br />Project Number Pro)apt No. 17.9001 South M81n Street Corridor Improvements Change Order Number 8 <br />To _ C.S Legacy Construction Inc. <br />Contrector <br />You are hereby directed to make the herrin changes from the plena and specifications or do the following dascrlhed work not Included In the plans and <br />spe9dlcations pn this conlmci. <br />NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY <br />Unless.Dthernlss stated, rates for rental of equipment cover only such time as equlpmont Is ritually u'sdd and no allowance wUl he made for Idle time, <br />Change requested by <br />PUBLIC WORKS AGENCY <br />EXTRA WORK AT AMEED PRICE UNIT PRICE <br />3. Due to existing utility conflicts, the sewer main profile between Myrtle Avenue and First <br />Str2s4:Wa5 IoWered with additional excavation of material and backfill with approved backfill <br />marke, �l.(PCO#21) <br />TOTAL AGrteleo PRtca = $23,245.0TIAL <br />41.11 City requested additional curb and gutter.along Bishop Street requiring the use of trench <br />plates'to maintain access to local business. (PCO #22) <br />_TQTAL AGREED PRICE =.49 <br />I ITIAL <br />5. An abandoned traffic signal / street light footing uncovered during the Installation of the <br />McFadden intersection ADA. ramp required partial removal of footing to complete the <br />Installation of the ramp. (PCO #23) <br />TQTAL. AGREED PRICE 7TI <br />` <br />Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.