Laserfiche WebLink
CITY OF SANTA ATRIAâ–º <br />PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Project Number Project No, 17-9001 South Main Street Corridor Improvements Change Order Number 3 <br />To C.S Legacy Construction Inc <br />Contractor <br />You areharsby directed to make the herein changes from the plane ohd on this contract, specifications or do the following described work not included (n the plans and <br />apedificatione <br />.NOTE: THIS CHANGE ORDER.IS NOTEFFBCTIVE UNTIL APPROVED 6Y THE CITY COUNCILOR CITY MANAGER, <br />Unless otherwise spied, rates for rental of equipment dovdr only such time as equipment is actually used and no allawancawill be madeforidle time, <br />change requested by <br />PUBLIC WORKS AGENCY <br />6. During installation of sidewalk improvements at Cubbon Street, an existing street light . <br />required temporary bracing due to condition of street light foundation. Street light to be <br />replaced With proJect improvements. (PCO 424) <br />TOTAL AGREED PRICE = $5 9.O91 <br />INITIAL <br />7. Due to field conditions on existing striping creating narrow number 2 lanes In each direction <br />for` tt`8.ffic Arid OCTA,'bus circulation, temporary striping was required in the locations of the <br />tra IC``04 fining ptanter9 to accommodate existing circulation. (PGO #26R1) <br />TOTAL AGREED PRICE = $10,16,2 <br />NITIAL <br />B, Due to field conditions on placing the designed Filterra Biofiltration units, City requested <br />additional pothole information to approve location. (PCO #29) <br />TOTAL AGREED PRICE XTRA $IT <br />IAL <br />ECONTRACT TIME <br />*Time extension to he deferred until all extra work is completed and critical path impacts <br />are known. <br />c <br />Page 3 of 4 <br />