My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C.S. LEGACY CONSTRUCTION, INC. (2)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
C.S. LEGACY CONSTRUCTION, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2025 9:50:34 AM
Creation date
2/10/2021 5:50:33 PM
Metadata
Fields
Template:
Contracts
Company Name
C.S. LEGACY CONSTRUCTION, INC.
Contract #
P 17-9001, 18-6911
Agency
Public Works
Council Approval Date
1/19/2021
Expiration Date
12/4/2023
Notes
20-6958, 21-6451, 19-6940
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ATRIAâ–º <br />PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Project Number Project No, 17-9001 South Main Street Corridor Improvements Change Order Number 3 <br />To C.S Legacy Construction Inc <br />Contractor <br />You areharsby directed to make the herein changes from the plane ohd on this contract, specifications or do the following described work not included (n the plans and <br />apedificatione <br />.NOTE: THIS CHANGE ORDER.IS NOTEFFBCTIVE UNTIL APPROVED 6Y THE CITY COUNCILOR CITY MANAGER, <br />Unless otherwise spied, rates for rental of equipment dovdr only such time as equipment is actually used and no allawancawill be madeforidle time, <br />change requested by <br />PUBLIC WORKS AGENCY <br />6. During installation of sidewalk improvements at Cubbon Street, an existing street light . <br />required temporary bracing due to condition of street light foundation. Street light to be <br />replaced With proJect improvements. (PCO 424) <br />TOTAL AGREED PRICE = $5 9.O91 <br />INITIAL <br />7. Due to field conditions on existing striping creating narrow number 2 lanes In each direction <br />for` tt`8.ffic Arid OCTA,'bus circulation, temporary striping was required in the locations of the <br />tra IC``04 fining ptanter9 to accommodate existing circulation. (PGO #26R1) <br />TOTAL AGREED PRICE = $10,16,2 <br />NITIAL <br />B, Due to field conditions on placing the designed Filterra Biofiltration units, City requested <br />additional pothole information to approve location. (PCO #29) <br />TOTAL AGREED PRICE XTRA $IT <br />IAL <br />ECONTRACT TIME <br />*Time extension to he deferred until all extra work is completed and critical path impacts <br />are known. <br />c <br />Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.