My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C.S. LEGACY CONSTRUCTION, INC. (2)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
C.S. LEGACY CONSTRUCTION, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2025 9:50:34 AM
Creation date
2/10/2021 5:50:33 PM
Metadata
Fields
Template:
Contracts
Company Name
C.S. LEGACY CONSTRUCTION, INC.
Contract #
P 17-9001, 18-6911
Agency
Public Works
Council Approval Date
1/19/2021
Expiration Date
12/4/2023
Notes
20-6958, 21-6451, 19-6940
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N <br />N <br />N <br />co <br />z <br />CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Project Number Project No. 17-9001 South Main Street Corridor Improvements Change Order Number <br />To C.S Legacy Construction, Inc. Contractor <br />You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br />specifications on this contract. <br />NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br />Unless otherwise stated, rates for rental of equipment cower only such time as equipment is actually used and no allowance will be made for idle time. <br />Change requested by PUBLIC WORKS AGENCY <br />EXTRA WORK AT AGREED PRICE UNIT PRICE <br />Due to field conditions for the location of unmarked underground potential conflicts in the <br />installation of the bus shelter footing, additional labor required around location of uncovered <br />underground utilities. (PCO 36R1) <br />TOTAL AGREED PRICE _ $967.72 <br />2. Due to the installation of new street light conduit system, the elimination of two street light <br />locations for the illuminated crosswalk at Walnut Street, the street light foundation design <br />adjustment from bid and the elimination of installation of pull boxes. Additional and <br />deductive costs for the overall Street Light installation required adjustment of the bid lump <br />sum costs. (PCO #49) <br />TOTAL AGREED PRICE _ $49,834.69 <br />3. Due to field conditions for the location of unmarked underground potential conflicts in the <br />installation of the bus shelter footing, additional labor required around location of uncovered <br />underground utilities. (PCO #52) <br />TOTAL AGREED PRICE _ $274.60 <br />4. Due to field conditions in the determination of the location for Filterra units on the project <br />corridor, an additional location on Edinger was evaluated for potential use to meet the <br />project WQMP requirements. (PCO #53) <br />TOTAL AGREED PRICE _ $2,079.03 <br />5. Due to the existing street light meter pedestal condition, the City requested replacement <br />service pedestals for 6 locations as materials only. Installation to be addressed by City <br />directly. (PCO #93) <br />Page 1 of 3 <br />TOTAL AGREED PRICE _ $36,838.69 <br />
The URL can be used to link to this page
Your browser does not support the video tag.