My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C.S. LEGACY CONSTRUCTION, INC. (2)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
C.S. LEGACY CONSTRUCTION, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2025 9:50:34 AM
Creation date
2/10/2021 5:50:33 PM
Metadata
Fields
Template:
Contracts
Company Name
C.S. LEGACY CONSTRUCTION, INC.
Contract #
P 17-9001, 18-6911
Agency
Public Works
Council Approval Date
1/19/2021
Expiration Date
12/4/2023
Notes
20-6958, 21-6451, 19-6940
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Project Number Project No. 17-9001 South Main Street Corridor Improvements Change Order Number 5 <br />To C.S Legacy Construction, Inc. Contractor <br />You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br />specifications on this contract. <br />NOTE; THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCILOR CITY MANAGER. <br />Unless otherwise staled, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br />Change requested by <br />PUBLIC WORKS AGENCY <br />EXTRA WORK AT AGREED PRICE UNIT PRICE <br />6. Due to the Gas Company requiring 3 weeks to respond to adjust a meter box in the <br />sidewalk location near 210 Main Street, CS Legacy performed the adjustment. (PCO #94) <br />TOTAL AGREED PRICE = $84.04 <br />City requested revision of the Warner Sewer Main connection connecting to the existing <br />OCSD main sewer line across median on Main Street near Warner Avenue due to the <br />condition of the existing sewer connection. (FD #7) <br />NOT TO EXCEED PRICE = $116,000.00 <br />8. City requested replacement of existing deteriorated storm drain uncovered during the <br />installation of the water main on Main Street near the intersection of Broadway connecting <br />the catch basins on Main Street at the intersection. (FD #8) <br />NOT TO EXCEED PRICE = $65,000.00 <br />EXTRA CONTRACT TIME <br />*Time extension to be deferred until all extra work is completed and critical path impacts <br />are known. <br />TOTAL CHANGE ORDER AMOUNT = $270,078.67 <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.