CITY OF SANTA <br />ANA <br />PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Project Number Project No. 17-9001 South Main Street Corridor Improvements Change Order Number <br />To C.S Legacy Construction Inc. Contractor <br />You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br />specifications on this contract. <br />NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br />Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br />Change requested by <br />PUBLIC WORKS AGENCY <br />EXTRA WORK AT AGREED UNIT PRICE <br />7. Due to field conditions and obstructions in the parkway area, an additional location for the <br />installation of the Filterra unit was evaluated in a second location near Main Street and Dyer <br />Road. (PCO #97) <br />TOTAL AGREED PRICE = $2,624.41 <br />6. Due to the Walnut Street PCC pavement thickness requiring an increased depth from 6 inches <br />to 10 inches to accommodate the OCFA Fire Station truck loading, additional re -grading and <br />forming was required on the west side of the intersection. Part 1. (PCO #99) <br />TOTAL AGREED PRICE = $378.68 <br />9. Due to the Walnut Street PCC pavement thickness requiring an increased depth from 6 inches <br />to 10 inches to accommodate the OCFA Fire Station truck loading, additional re -grading and <br />forming was required on the west side of the intersection. Part 2. (PCO #100) <br />TOTAL AGREED PRICE = $2,043.76 <br />10. Due to construction operations timing of the Walnut Pedestrian Crossing installation and the <br />Focus Intersection flatwork, a conduit was installed to facilitate the future Pedestrian Crossing <br />scope of work. (PCO #101) <br />TOTAL AGREED PRICE = $862.08 <br />11. Due to field conditions and obstructions in the parkway area, an additional location for the <br />installation of the Filterra unit was evaluated near 2209 Main Street. (PCO #102) <br />TOTAL AGREED PRICE = $336.16 <br />Page 2 of 5 <br />