Laserfiche WebLink
CITY OF SANTA <br />ANA <br />PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Project Number Project No. 17-9001 South Main Street Corridor Improvements Change Order Number 6 <br />To C.S Legacy Construction Inc. Contractor <br />You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br />specifications on this contract. <br />NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br />Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br />Change requested by <br />PUBLIC WORKS AGENCY <br />EXTRA WORK AT AGREED UNIT PRICE <br />12. Due to field conditions and obstructions in the parkway area, an additional location for the <br />installation of the Filterra unit was evaluated near 2209 Main Street. (PCO #103) <br />TOTAL AGREED PRICE = $1,406.13 <br />13. Due to field conditions for the location of Bus Shelter Location (Edinger) required extension of <br />the bus shelter foundation to provide adequate ADA access (PCO #104) <br />TOTAL AGREED PRICE = $2,241.44 <br />14. Due to Main Street Gas Line in Street Light foundations, additional protection for the gas line <br />was required between Chestnut and McFadden Intersection and other locations. (PCO #106) <br />TOTAL AGREED PRICE = $30,369.24 <br />15. Due to Main Street design adjustments, additional redesign was required by Bravo Signs to <br />submit to the City for additional review. (PCO #107) <br />TOTAL AGREED PRICE = $4,943.95 <br />16. Due to Focus Intersection PCC pavement color contrast inadequate to meet City Main Street <br />Vision requirements, an alternate PCC color was selected with an incremental adjustment from <br />Bid Item No. 31. This adjustment shall be on unit cost basis per CY as installed under Bid Item <br />No. 31 work. (PCO #108) <br />TOTAL AGREED PRICE _ $35,022.59 NOT TO EXCEED FOR 1,100 CY <br />17. Due to Main Street field underground conflicts for the foundations of the festoon lights between <br />First Street and Walnut Street, design adjustments were required to modify the foundation <br />construction. (PCO #109.2) <br />TOTAL AGREED PRICE = $18,124.42 <br />Page 3 of 5 <br />