My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MARK THOMAS & COMPANY, INC.
Clerk
>
Contracts / Agreements
>
M
>
MARK THOMAS & COMPANY, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2021 11:19:09 AM
Creation date
2/22/2021 11:15:13 AM
Metadata
Fields
Template:
Contracts
Company Name
MARK THOMAS & COMPANY, INC.
Contract #
A-2021-018
Agency
Public Works
Council Approval Date
2/2/2021
Expiration Date
2/1/2024
Insurance Exp Date
1/1/1900
Destruction Year
2029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL STANDARD AVENUE PROTECTED BIKE LANES <br />3RD TO WARNER <br />City of Santa Ana <br />Pedestrian Crossings <br />The project plans to signalize the Standard Avenue/Bishop Street intersection better serving pedestrian traffic <br />including youth to Walker Elementary School. Additional pedestrian improvements include a Pedestrian <br />Hybrid Beacon at Wakeham Avenue or Wisteria Place, and discussion with City staff to determine if striping <br />additional crosswalks is desired. The Safe Mobility Santa Ana Plan (2016) prepared a comparison of <br />segment demand and infrastructure supply analysis that identified high demand with high supply need on <br />Standard Avenue between McFadden Avenue and Edinger Avenue. Mark Thomas team visits to the area <br />show a high degree of pedestrian crossing area here as well as north of McFadden Avenue. We will work <br />with the City to identify potential additional pedestrian crossing improvements and costs. <br />Bike Signals <br />The project includes a mix of bikeway types about Edinger Avenue with buffered bike lanes southerly <br />and a separated bikeway northerly. Typically a separated bikeway would include dedicated bicycle signal <br />phasing and employ no turn on red signage, but this treatment would not be included in a buffered bike lane <br />configuration where the right -turn traffic would cross the bikeway at the green conflict zone striping. We <br />recognize the City seeks to provide a high quality bikeway corridor to serve the existing and future bikeway <br />traffic and will work with the City to evaluate available project budget to include bike phasing and provide a <br />consistent and intuitive signal phasing treatment along the corridor. For our protected bikeway along Hoover <br />Street in Westerminster, we modified the existing signals to include bicycle phases and no turn on red blank - <br />out signs for turning vehicles. <br />Land Use Access <br />The project will provide a 2-mile north -south corridor as identified in the CSACS Plan. However, the design <br />should incorporate access to land uses along the roadway and be sensitive to needs of localized uses such <br />as school drop-off activity at Madison Elementary or peak demands at Madison Park. Please see the graphic <br />below for initial design considerations near Walker Elementary School. Additional land use concerns may <br />arise at Walker Elementary and the future park at the northeast corner of the Standard Avenue/McFadden <br />Avenue intersection. <br />,u�ilo(� 'tlaCa/-tvrce���tS <br />1�ict�-up7 <br />V IG i3# reWmmen05 a minimum 3-TOOT OOTTar <br />). for parking protected Class IV bikeways.The to, <br />road section can be evaluated to provide a. <br />i w!der buffer than shown in the concept plans. a �, <br />Beveled curbs are angled to reduce pedal <br />Strike hazardsfor bicyclists. <br />"..+�. <br />Vertical cares prohibit fvehicles <br />cles <br />'n't, Chnlent of vehielas <br />into the bikeway. <br />
The URL can be used to link to this page
Your browser does not support the video tag.