My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MARK THOMAS & COMPANY, INC.
Clerk
>
Contracts / Agreements
>
M
>
MARK THOMAS & COMPANY, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2021 11:19:09 AM
Creation date
2/22/2021 11:15:13 AM
Metadata
Fields
Template:
Contracts
Company Name
MARK THOMAS & COMPANY, INC.
Contract #
A-2021-018
Agency
Public Works
Council Approval Date
2/2/2021
Expiration Date
2/1/2024
Insurance Exp Date
1/1/1900
Destruction Year
2029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL STANDARD AVENUE PROTECTED BIKE LANES <br />3RD To WARNER <br />City of Santa Ana F-1 me <br />,® <br />Mark Thomas has planned and designed a wide variety of State and federally funded capital improvement <br />projects for public agencies. Projects have included complete streets design, active transportation facilities, <br />roadway widenings and reconstruction, pavement rehabilitation, multimodal enhancements, signing and <br />striping, drainage facilities, utility coordination and relocation, and ADA improvements. <br />The following representative projects demonstrate our experience, competency and capability in <br />successfully delivering transportation improvement projects to public agencies throughout the state. <br />MENDEZ HISTORIC TRAIL & GREEN STREET BIKEWAY <br />Westminster <br />The Mendez Historic Trail runs along Hoover Street and was redefined <br />from an auto -centric 5-lane roadway to a bicycle and pedestrian friendly <br />street. Paul Martin, while working for OCTA, worked with the City of <br />Westminster to identify potential active transportation solutions for the <br />Mendez Historic Trail Green & Street Bikeway and secure $2.3M from <br />the California Natural Resource Agency's Urban Greening Program. <br />Mark Thomas is currently providing the City of Westminster with <br />engineering design services for a range of local roadway improvements <br />to complete this project that will develop layered transportation <br />networks, reduce vehicle travel lanes and create a two-mile long Class <br />IV bikeway along the western limits of the corridor. A raised median will <br />be incorporated to provide separation between vehicles and bicycles, <br />and serve as a stormwater treatment for roadway runoff. Project <br />improvements also include traffic signal modifications, pedestrian <br />lighting, correction of deficient driveways, ADA upgrades, pavement <br />rehabilitation and overlay, and curb ramps. <br />We are also coordinating with railroad authorities and preparing GO- <br />88B applications for signalized at -grade rail crossings at Bolsa Avenue, <br />Hazard Avenue, Westminster Boulevard, Trask Avenue, and Garden <br />Grove Boulevard. <br />CLIENT <br />City of Westminster <br />REFERENCE <br />Adolfo Ozaeta <br />City of Westminster <br />aozaeta@westmi nster-ca. gov <br />PERIOD OF <br />PERFORMANCE <br />2019 - Ongoing <br />KEY FEATURES <br />• Class IV Protected Bikeway <br />Design <br />• Traffic Signal Modifications <br />• LID Implementation <br />• Railroad/CPUC Coordination <br />• Public Engagement <br />The project is on schedule <br />and within budget. <br />
The URL can be used to link to this page
Your browser does not support the video tag.