My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IDS GROUP (2)
Clerk
>
Contracts / Agreements
>
I
>
IDS GROUP (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2021 3:59:02 PM
Creation date
5/6/2021 4:25:49 PM
Metadata
Fields
Template:
Contracts
Company Name
IDS GROUP
Contract #
A-2021-058
Agency
Public Works
Council Approval Date
4/20/2021
Expiration Date
4/20/2024
Insurance Exp Date
11/12/2021
Destruction Year
2029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix <br />ATTACHMENT I <br />SCOPE OF WORK <br />CITY OF SANTA ANA <br />REQUEST FOR PROPOSALS <br />FOR <br />ELECTRICAL LIGHTING DESIGN SERVICES FOR <br />PACIFIC ELECTRIC BIKE TRAIL LIGHTING PHASE 2 <br />& SANDPOINTE PARK <br />RFP NO.: 20-129 <br />Introduction and Description of Work <br />The City desires to continue its efforts in installing security lighting systems by using the same <br />hardware and fixtures as those recently installed by the manufacturer Ameron International <br />Corporation at: Pacific Electric Bike Trail Phase 1 (McFadden Ave to Occidental St) and <br />Saddleback View Park (see attachment 5). <br />The specific works to be included are as follows: <br />Pacific Electric Bike Trail — Phase 2 (Occidental Street to Warner Avenue) is the southern <br />phase from Pacific Electric Bike Trail — Phase 1 project from McFadden Avenue to <br />Occidental Street. Same type of lighting will be continued and shall be designed for the <br />entire length of the Pacific Electric Bike Trail from Occidental Street to Warner Ave. The <br />trail currently does not have an electrical nor lighting system. Electrical connection points <br />shall be verified and proposed for installation accordingly. Alignment of lighting fixtures <br />shall face towards the bike trail path and maintain a consistent distance from the edge of <br />pavement fr. All lighting will be 16 feet from the ground and anti -graffiti coat will be used <br />for every light fixture and its base. (See Attachment 4, Exhibit 1). <br />Sandpointe Park currently does not have electrical not lighting system. The electrical <br />connection point shall be verified and proposed for installation accordingly. The lighting <br />system shall be hard -wired, coated in anti -graffiti coat, 16 feet from the ground, and will <br />hang towards the meandering walkway. All existing lights will be replaced and the <br />location can be modified depending on the developed photometric diagram for the park. <br />Alignment of lighting fixtures shall maintain a consistent distance from the edge of the <br />meandering walkway for aesthetic purposes (see Attachment 4, Exhibit 2). <br />City of Santa Ana RFP 20-129 <br />Page Al-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.