Laserfiche WebLink
Minimum Requirement <br />The responsible -charge of the projects shall be a licensed professional electrical engineer and shall <br />sign and stamp all plan sheets, the title sheet of the specifications, calculations, and reports. <br />Project Scone <br />The project scope involves the preparation of PS&E for new electrical and security lighting <br />systems at: 1) Pacific Electric Bike Trail — Phase 2; and 2) Sandpointe Park. <br />City of Santa Ana RFP 20-129 <br />Page Al-2 <br />