My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IDS GROUP (2)
Clerk
>
Contracts / Agreements
>
I
>
IDS GROUP (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2021 3:59:02 PM
Creation date
5/6/2021 4:25:49 PM
Metadata
Fields
Template:
Contracts
Company Name
IDS GROUP
Contract #
A-2021-058
Agency
Public Works
Council Approval Date
4/20/2021
Expiration Date
4/20/2024
Insurance Exp Date
11/12/2021
Destruction Year
2029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Electric Bike Trail —Phase 2, Sand vointe Park <br />RFP No.20-129 <br />• Attend the pre -construction meeting. <br />• Review and approve submittals, as requested. If requested, IDS shall complete submittal reviews within one (1) <br />weeks of receipt. <br />• IDS will provide periodic field reviews and bring to the attention of the City of Santa Ana any defects or deficiencies <br />in the work by the construction contractor which the Consultant may observe. IDS shall have no authority to issue <br />instruction on behalf of the City of Santa Ana, or to deputize another to do so. <br />• IDS will be available- as requested by the City, to resolve discrepancies in the contract documents. IDS shall bring <br />to the attention of the City any defects or deficiencies in the work by the construction contractor which the <br />Consultant may observe. IDS shall have no authority to issue instruction on behalf of the City, or to deputize <br />another to do so. <br />• Furnish, at the consultant's sole cost and expense, all necessary drawings for corrections and change orders <br />required by errors and omissions of the Consultant. Electronic files for the change orders shall be submitted to the <br />city for duplication and distribution. <br />Record Drawings /As -Built Plans: <br />Upon completion of construction, the record drawings kept by the General Contractor shall be turned over to the <br />IDS for preparation of "as -built" plans. IDS shall incorporate all changes to the plans electronically with all <br />necessary revision notations. Once plans have been updated, IDS will submit an electronic file to the City in <br />Microstation V81 CADD and pdf formats of the final as -built drawings via CD, e-mail, or through an FTP site. <br />AA IDS GROUP Page 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.