Laserfiche WebLink
Pacific Electric Bike Trail— Phase 2, SandDointe Park <br />RFP No.20-129 <br />Task 3: Construction Documents (85% and 100% plans) <br />Construction Documents shall include finalizing Design Development plans, obtaining plan check approvals and <br />securing permitting. This includes the provision of detailed engineering and construction drawings that will serve as the <br />basis for both bid advertisement and construction. IDS shall also provide updated cost estimate reflecting finalized <br />plans, materials, systems, details of construction, and known or anticipated changes in the bidding market relative to <br />the project. <br />Engineering and design required tasks shall include, but may not be limited to: <br />• Plans and Specifications (Contract Documents) shall be reviewed (with the City staff) at 85% and 100%. <br />• Updated Cost Estimates. Project phasing may need to be considered and Contract Documents may need to be <br />structured accordingly pending available construction funding. <br />• Review sets s provided in PDF format. <br />• IDS will provide final plans in Micro Station V8i format and PDF format. <br />• IDS will prepare the Technical Specifications in Microsoft Word, using the City provided boiler plate. <br />• Quantity calculations shall be provided for Items that are applicable to this project, IDS will prepare and provide <br />cost estimates at milestone stages. <br />• A list of contract pay items with the descriptions and estimated quantities shall be provided for inclusion In Bid <br />Proposal and Definition of Bid Items of City Boiler Plate. <br />• All plan sheets and the title sheet of the specifications, calculations and reports shall be signed and stamped, <br />including license number and expiration date, by IDS' State of California Registered Professional Engineer in the <br />field of Electrical Engineering responsible for the project. <br />• Coordinate plan check with the City of Santa Ana and other agencies including, but not limited to, City of Santa <br />Ana Public Works Design and Parks Recreation & Community Services Division. <br />Task 4: Bid Advertisement, Construction Administration, Record Drawings: <br />If requested, IDS shall provide support during bid advertisement and construction, and provide record drawings as <br />described below: <br />Bid Advertisement: <br />If requested, IDS shall: <br />• Respond to written Requests for Information (RFI) to provide clarification or resolve discrepancies in the contract <br />documents. Responses shall be completed within three (3) working days; <br />• Review addenda, and <br />• Attend pre -bid meeting. <br />Construction Support: <br />All construction support work shall be at the request of and coordinated by the City of Santa Ana. As requested, IDS <br />shall: <br />AA IDS GROUP <br />Page 20 <br />