My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DOKKEN ENGINEERING
Clerk
>
Contracts / Agreements
>
D
>
DOKKEN ENGINEERING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2021 10:46:21 AM
Creation date
6/14/2021 10:23:02 AM
Metadata
Fields
Template:
Contracts
Company Name
DOKKEN ENGINEERING
Contract #
A-2021-084
Agency
Public Works
Council Approval Date
6/1/2021
Expiration Date
5/30/2024
Insurance Exp Date
1/1/1900
Destruction Year
2029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MCFADDEN AVENUE PROTECTED BIKE LANE AND <br />BICYCLE BOULEVARD PROJECT ,�z�a• <br />CITY OF SANTA ANA by <br />With civil improvements, such as bulb -outs, curbs, and curb ramps being designed via The McFadden <br />Rehabilitation Project between Fairview Avenue and Raitt Street; it is our team's understanding that <br />this McFadden Bike Project will still be responsible for designing the traffic signal modifications and <br />traffic signal interconnection improvements along this stretch of the corridor. The Standard Bike <br />Project plans to install a fully protected intersection at <br />Or <br />McFadden Avenue and Standard Avenue, a "first of <br />it's kind" for this area and likely all of Southern ? �: <br />California. We appreciate innovation in design and <br />have recently worked with the City of Palm Desert to <br />e of <br />transform the San Pablo Avenue Corridor into an <br />award -winning streetscape with innovative designs, <br />such as median parking, roundabouts with Class 1� <br />and Class 2 bicycle facilities on entry, and low -impact - _/ <br />drainage and water quality design that utilized the . ? <br />desert's naturally infiltrative soils to treat storm water. if 1�, <br />Bikeway Network <br />The proposed project will install bike lanes and routes of three different varieties to accomplish the <br />goal of achieving complete bikeway network connectivity. At the westerly limits of this project the 4- <br />lane roadway will remain with vehicular travel lanes to be reduced to 10' wide and Class 2 bike lanes <br />to be installed along the outer shoulders. This configuration will remain heading easterly along <br />McFadden Avenue from Harbor Boulevard, through two signalized intersections at Riverview <br />Marketplace and Jackson Street, to the bridge overcrossing the Santa Ana River where the 4-lane <br />roadway will be reduced to 2-lanes via a road -diet. This area highlights the first critical transition zone <br />where vehicles may tend to increase speeds to "get around" perceived slower moving traffic. It also <br />highlights an important junction between the Santa Ana River Bike Trail and the new bike lanes to be <br />added along McFadden Avenue. This is an area where proper signage and pavement markings will <br />be necessary to communicate bikeway connectivity options and roadway safety. <br />As McFadden Avenue continues easterly across the signalized intersection at Mohawk Drive the <br />roadway cross-section narrows, so the buffered portion of the bike lane will reduce in width. Heading <br />across the Fairview Street signalized intersection the Class 2 buffered bike lanes will transition to <br />Class 4 protected bike lanes in the eastbound direction with parked vehicles to the left of the curb- <br />side bike lanes. This is another area of opportunity for pavement markings and signage to coherently <br />direct the traveling public to where they need to be, especially since the westbound bike lanes will <br />essentially remain Class 2 through three more signalized intersections at Sullivan Street, Center <br />Street, and Raitt Street. With parking allowed along the southerly curb line, but not along the northerly <br />curb line, vehicles travelling eastbound will not be able to see bicyclists in the Class 4 protected bike <br />lane to their right side as easily as westbound drivers will be able to see bicycles in the Class 2 buffered <br />bike lane to their right side. This is a critical component of the installation of Class 4 bike lanes which <br />requires complete comprehension and education by the travelling public to achieve the safest roads. <br />Within the section between Fairview and Raitt Streets, then continuing easterly the roadway character <br />slows and cross -streets are often treated with stop -control rather than signalization. As bike lanes <br />cross these stop -controlled minor side -streets they will be treated with green conflict paint and dashed <br />bike lane markings. East of Raitt Street the center median is eliminated in favor of parking on both <br />sides of the street, thus the Class 4 bike lane treatments will be provided for both westbound and <br />eastbound cyclists through the signalized intersection at Pacific Avenue to the west side of the traffic <br />signal at Bristol Street. Heading easterly of Bristol Street the roadway width isn't sufficient to provide <br />for separated or protected bike lanes therefore "Sharrows" and "Bikes May Use Full Lane" signs will <br />be utilized to create a Class 3 Bike Boulevard where cyclists travel in line with vehicles driving at <br />slower speeds. Spacing of the newly installed "Sharrows" and signs will be of utmost importance in <br />maintaining driver awareness of the shared road situation, which continues for nearly a mile through <br />three signalized intersections at Shelton Street, Flower Street, and South Broadway. <br />DOKKEN Page I II <br />PI N 0 TN AP It I NN <br />
The URL can be used to link to this page
Your browser does not support the video tag.