My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DOKKEN ENGINEERING
Clerk
>
Contracts / Agreements
>
D
>
DOKKEN ENGINEERING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2021 10:46:21 AM
Creation date
6/14/2021 10:23:02 AM
Metadata
Fields
Template:
Contracts
Company Name
DOKKEN ENGINEERING
Contract #
A-2021-084
Agency
Public Works
Council Approval Date
6/1/2021
Expiration Date
5/30/2024
Insurance Exp Date
1/1/1900
Destruction Year
2029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
v <br />-- MCFADDEN AVENUE PROTECTED BIKE LANE AND �y <br />BICYCLE BOULEVARD PROJECT . `" }. <br />CITY OF SANTA ANA <br />s <br />CLIENT: <br />Dokken Engineering provided <br />CITY OF VISTA <br />project management and design <br />200 Civic Center Drive <br />services to the City of Vista for <br />Vista, CA 92084 <br />Phases II and III of the Paseo <br />Santa Fe Streetscape <br />project. The <br />CONTACT/REFERENCE: <br />project Is located <br />along South <br />Conrad "Skip" Hammann, PE <br />Santa Fe Avenue between Main <br />7' <br />(760) 802-5605 <br />Street and Civic Center Drive. The <br />Skip.hammann@gmail.com <br />project is a "road diet" project in <br />which the existing four lane <br />YEAR COMPLETED: <br />roadway is being converted to a two-lane roadway with added <br />■ 2021 <br />parking and widened pedestrian walkways for trees and plazas. <br />The road between the parking areas is designed with an inverted <br />SCOPE OF SERVICES: <br />crown along the drive aisles and standard crowns along the <br />parking areas, known as an M-section, to allow the median to be <br />■ Project Management <br />used to treat storm water via permeable pavers and filtered inlets. <br />■ Green Street Design <br />■ Roadway Design with ADA <br />Dokken provided preliminary design, PS&E, and construction <br />Compliant Design <br />support for the Phase II and Phase III segments. The design <br />■ ctio <br />Intersection Designs <br />includes the relocation and modification of master planned sewer, <br />■ Inters and Irrigation <br />water and storm drain infrastructure; streetscape improvements <br />that include a roundabout within each phase and <br />enhanced <br />■ Water Quality <br />landscaping, hardscaping and pedestrian oriented streetscape <br />■ Utility Coordination <br />furnishings; permanent water quality treatment infrastructure <br />■ Traffic Signals/Lighting Design <br />(Silva Cells for root growth and trash filters at drainage inlets); <br />■ Signing and Striping <br />removal of existing street lighting in favor of pedestrian and driver <br />■ Multi -Agency Coordination <br />friendly corridor lighting; removal of one existing traffic signal and <br />■ Design Support During <br />modification of another; and 20B Conversion of overhead utilities <br />Construction <br />in addition to right-of-way support via property owner exhibits. <br />•CLIENT: ' <br />-. Dokken has completed the traffic r`f - <br />COUNTY OF SAN DIEGO <br />striping and signing plans to <br />T <br />6500.Overland Avenue <br />support and assist the Department <br />Suite 320 <br />of Public Works County of San <br />San Diego, CA 92123 <br />Diego Road Maintenance Projects <br />for the past three fiscal years (FY <br />CONTACT/REFERENCE: <br />17/18, FY 18/19, and FY 19/20) . <br />Keith Kezer <br />The scope of work for these task <br />e& <br />(858) 495-5752 <br />orders involved base mapping of L, <br />keith.kezer@sdcounty.ca.gov <br />existing signing and striping assets within project limits utilizing <br />GIS and other aerial imagery, field reconnaissance and <br />YEAR COMPLETED <br />confirmation of the existing conditions of each project area, <br />IS 2020 <br />evaluation of proposed bike lanes/routes per the County's Master <br />Bicycle Plan, implementation of updates to signing and striping <br />per the latest CA MUTCD and County design standards, and <br />SCOPE OF SERVICES: <br />preparation of construction drawings with proposed <br />■ Project Management <br />improvements and all comments addressed. <br />■ StrePavement Rehabilitation <br />■ Pavement Rehabilitation <br />In total, over the last three years we have prepared traffic <br />■ Civil/Site/Path/ADA <br />striping and signing plans for nearly 57 miles of roadway, <br />adding approximately 20 miles of Class II bike lanes and 15 <br />■ Signing & Striping <br />miles of Class III bike routes to County roads during the <br />■ Bike Lane Evaluation <br />contracted fiscal years in addition to evaluation of over 1,200 curb <br />ramps for ADA compliance along these roadways. <br />DOKKEN Page 1 15 <br />I, N G I N P]IC R I NQ <br />
The URL can be used to link to this page
Your browser does not support the video tag.