!nneth Gong, PE • Experienced plan checker with 32-years of experience and a total of 37-
<br />President years of industry experience.
<br />• Public -sector practice including 9-years with OC Flood Control, OC
<br />I Subdivision Division, and OC Lab.
<br />• Private -sector practice includes providing plan check services to various
<br />municipalities in Southern California with specific expertise in the review
<br />and analysis of drainage facilities.
<br />• Strong track record in consistent delivery of plan check reviews within
<br />_ time frame commitments.
<br />• Bachelor of Science in Civil Engineering, University of California, Irvine,
<br />California; Registered Civil Engineer (CA RCE 36494); General
<br />Contractor, B Classification.
<br />As a full -service engineering firm, ASCE have provided a wide array of professional
<br />engineering, mapping, survey, plan/map checking, and other services to various
<br />• municipalities and private clients for the past 40 years. GEI have focused exclusively on
<br />providing professional plan checking services to various municipalities over the past 32
<br />years, developing long-standing clients including for City of Moreno Valley (18 years), City of San
<br />Clemente (32 years), and City of San Juan Capistrano (30 years). Projects reviewed include residential
<br />tracts, commercial, multi -use, infill and industrial sites that typical includes rough grading, precise
<br />grading, street, storm drain, sewer and water, drainage reports, soils reports, structural calculations,
<br />subdivision tract maps and parcel maps. Tract and parcel maps are reviewed for the procedure of
<br />survey, completeness and accuracy of data notation, mathematical closure, dedication and easement
<br />provisions, and legal description in compliance with the Subdivision Map Act, the Land Surveyor's Act,
<br />the approved Tentative Map, the approved Conditions of Approval, and the current title report. Our
<br />expertise also includes the review of Flood Control and Storm Drain projects at the Regional, Master
<br />Planned, and Local Drainage levels inclusive of storm drain facilities (pipes, box culvert, channels,
<br />etc.), hydrology reports (i.e., existing / developed / interim conditions, detention basin and routing
<br />analysis, etc.), hydraulic calculations (i.e., pipe and catch basin sizing, street flooding analysis, etc.)
<br />and WQMP reports. ASCE's capabilities as a full -service engineering and surveying firm along with
<br />GEI exclusive plan checking background affords us the expertise and resource to provide the City with
<br />exceptional on -call plan check / plan review services.
<br />= ASCE have an excellent and long-standing relationship with Gong Enterprises (GEI) and
<br />• have in the past provided professional plan check services on numerous development
<br />6 projects concurrently for the City of San Juan Capistrano. ASCE and GEI (as a team sub -
<br />consultant under ASCE) are also currently providing on -call project engineering services at
<br />the Orange County Great Park for the City of Irvine (inclusive of plan checking services), and are
<br />separately assisting the City of Santa Ana Public Works Agency in providing on -call development plan
<br />checking services to the Water Resources Division. ASCE in conjunction with GEI, our team
<br />subconsultant not only affords us the background, knowledge and expertise to discern technical design
<br />and constructability related issues, but also a thorough understanding of the intricacies and potential
<br />challenges that can emerge during the plan review process. Both Mr. Tan and Mr. Gong's public service
<br />backgrounds also provides an understanding from both private and public sector perspective. As
<br />shown above, the team directly responsible for the work will comprise of highly qualified senior -level
<br />professionals that utilize a balanced and comprehensive approach to the plan checking process. Aside
<br />from technical plan review, progress monitoring/tracking and Quality Assurance and Quality Control
<br />(QA/AC), the team will also seek to identify, document and communicate any other potential issues
<br />that may affect the project to City staff for further coordination and collaboration as needed. Key staff
<br />n; Page 7
<br />
|