Laserfiche WebLink
• Location <br />• Dimensions <br />• Asset identification number <br />• Trash capture device type and condition <br />• Damage (face plate, protection bar, manhole, interior, inlet/outlet pipes) <br />• Obstructions or vegetation growing <br />• Condition of "No Dumping" stencil <br />• Volume of trash, debris, and sediment removed during cleaning <br />• Inlet/outlet pipe diameter and material <br />f. Stencil "No Dumping Drains to Ocean" on the top of catch basin inlets. <br />g. Install and/or repair trash capture devices in Municipal catch basins, including but not <br />limited to: <br />• Connector Pipe Screen (CPS) units <br />• Auto -Retractable Screen (ARS) units <br />• Other devices listed on the State Water Resources Control Board Certified <br />Full Capture List of Trash Treatment Control Devices: <br />https://www.waterboards.ca.gov/water issues/brograms/stormwater/does/ <br />trash implementation/certified fcsdevicelist 16Feb2021.ndf <br />h. Provide on -call operations, maintenance, and repair services for the City's First Street <br />stormwater lift station (1) and Civic Center stormwater lift stations (2), including but <br />not limited to: <br />• Conducting routine and pre -storm inspections to verify all lift stations are <br />functioning properly and ready to pump stormwater <br />• Monitoring weather forecasts and performing inspections during rain <br />events to verify all lift stations are operational and there is no flooding in <br />areas served by the lift stations <br />• Routine exercising of all lift station pumps <br />• Routine testing of all lift station alarms <br />• Notifying the City of any lift station issues within 1-day of discovery <br />• Providing written inspection reports and photos for all lift station <br />inspections <br />• Vacuum cleaning lift station wet -wells, stormdrain lines, and catch basin <br />inlets to remove all trash, debris, and solids as -needed <br />• Monitoring SCADA systems and responding to alerts or errors as -needed <br />• Contractors will have access to lift station SCADA systems via <br />mobile device hot -spots <br />• Responding to and resolving urgent issues with the lift stations 24-hours a <br />City of Santa Ana RFP 21-004 Page Al-5 <br />