My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL AGENDA PACKET_2021-04-06
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
04/06/2021 Regular
>
FULL AGENDA PACKET_2021-04-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2021 5:35:42 PM
Creation date
7/8/2021 4:23:39 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
4/6/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
583
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA Addendum One <br />SPECIFICATIONS <br />PROJECT NO.: 21-6446 <br />BAKER-GLENWOOD SEWER MAIN UPGRADE <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />III X901351 <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the <br />following schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />I <br />Mobilization/Demobilization (No <br />I <br />LS <br />$ <br />$ <br />More than 5% of Total Bid) <br />3 5,_ pa o <br />3 0 o O <br />r <br />2 <br />Remove Existing Sewer Main and <br />1,450 <br />LF <br />$ <br />$ <br />Construct 10" PVC SDR-26 Sewer <br />Main <br />3 <br />Construct 4" or 6" PVC Sewer <br />30 <br />EA <br />$ <br />$ <br />Lateral and Cleanout (Open Trench) <br />3, & o <br />�r <br />—t, O 0 -0 <br />4 <br />Construct New P.C.C. Sewer <br />Manhole City Sid. Plan 1201 <br />4 <br />EA <br />$ <br />/0 000 <br />$ <br />Y00 0 <br />per <br />5 <br />Core New Sewer Connection Into <br />I <br />EA <br />$ <br />$ <br />Existing Manhole Structure <br />I ar 000 <br />1 a/ 00-0 <br />6 <br />Remove Existing Manhole Structure <br />4 <br />EA <br />$ <br />$ <br />a/00� <br />7 <br />Sewer Flow Level Monitoring & <br />Alarming Device <br />2 <br />EA <br />$ <br />9,000 <br />$ <br />ar 0 o-p <br />8 <br />CCTV Inspection of New Sewer <br />Main <br />1,450 <br />LF <br />S / O <br />$ I <br />9 <br />CCTV Inspection of New Sewer <br />Lateral <br />30 <br />EA <br />$ <br />ayo <br />$ <br />7,aoz) <br />10 <br />Bypass Pumping of Existing Sewer <br />Flow <br />1 <br />LS <br />$ <br />$7r �fl i7 <br />I 1 <br />Furnish and Install Traffic Loop Type <br />D <br />I <br />EA <br />$ <br />100 <br />$ <br />�( O ro <br />12 <br />Furnish and Install Traffic Loop Type <br />3 <br />EA <br />$ / �'7 <br />I <br />$ p D <br />I <br />13 <br />Asphalt Concrete (AC) Pavement <br />310 <br />TN <br />$/ a <br />$3S S0 <br />I/ <br />City Council 1 13 — 14 4/6/2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.