Laserfiche WebLink
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: 21-6446 <br />BAKER-GLENWOOD SEWER MAIN UPGRADE <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />14 <br />Asphalt Rubber Hot Mix (ARHM) <br />610 <br />TN <br />$ <br />$ 76,S-0 <br />a <br />15 <br />Asphalt Rubber Aggregate Membrane <br />(ARAM) <br />5,380 <br />SY <br />$ <br />13• co <br />$ <br />6 p, �'D <br />1a ! <br />16 <br />Cold Milling (T=3") <br />48,420 <br />SF <br />$ <br />p.vo <br />$ <br />Iq, 36� <br />17 <br />Unclassified Excavation <br />7 <br />CY <br />$ <br />60D <br />$ <br />Y,ao n <br />* 18 <br />PCC Cross -Gutter (Residential <br />Streets) <br />240 <br />SF <br />$ <br />lS o <br />S <br />3, 6 a D <br />*19 <br />Construct 6" Thick PCC Driveway <br />Approach per City Std_ Plan 1112 <br />60 <br />SF <br />$ <br />y0. 0,0 <br />S <br />Case 2 <br />*20 <br />Adjust Water Valve Frame and Cover <br />11 <br />EA <br />$.750 <br />Sg'aS-D <br />*21 <br />Additional Potholing (ArNecded) <br />10 <br />EA <br />$1/00 <br />S 1, D o 0 <br />22 <br />Signing and Striping <br />I <br />LS <br />$ <br />3, 75' o <br />, 7 so <br />23 <br />Traffic Control <br />I <br />LS <br />$ <br />$ <br />lSoo 0 <br />24 <br />As -Built <br />I <br />LS <br />$ 25,000 <br />$25,000 <br />City Council <br />2 <br />13 — 15 4/6/2021 <br />