My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL AGENDA PACKET_2021-04-20
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
04/20/2021 Regular
>
FULL AGENDA PACKET_2021-04-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2021 9:55:55 AM
Creation date
7/8/2021 4:33:46 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
4/20/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
423
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consultant Responsibilities: <br />The Consultant's responsibilities include the f dlowing: <br />Task 1: Pre[itninarh ErrgineerhW <br />Pretiminary Engineering shall include kick-off meeting with City Staff to discuss scope of work, <br />project required tasks and objectives, potential clenents and issues, and .schedule. Preliminary <br />Engineering will also include field work and subsequent meetings with City Taff as required for <br />preparation of site plans_ <br />Project required tasks include, but ma_y not be limited to: <br />• Identify the locations where all of the above ground equipment and light standards will be <br />installed.. <br />• Tdentify where all the underground utilities are located to eliminate field conflicts. <br />• Coordinate with Southern California Edison from application filing ( trough construclion and <br />until the lights arc lit. <br />Task 2: Design Dureiopment (30% puns) <br />Design development will involve the development of electrical system improvements for security <br />lighting as outlined in the preliminary engineering phase to address project required tasks and shall <br />include preliminary electrical engineering plans and cult estimate_ Should project scope exceed <br />available budget, project plans/specifications will be value enginccicd or phased as appropriate. <br />Electrical design lacks shall include, but may not be limited to. <br />• Title Sheet (City provide template) <br />• Flectrical & T.ighting plans <br />• I'hottmrerric. <br />• Load and Diagram schedule <br />• Details and notes <br />Task 3: Construction Documents (85%, and 100% plans) <br />Construction Doctrnrents shall include finalizing Design Development plans, obtaining plan check <br />approvals and securing permitting. Ibis includes the provision of detailed engineering and <br />construction drawings that will serve as the basis for both bid advcnisenrerrt and anrstruction. <br />Consultant shall also provide updated cost estirnale which shall retied finalized plans, materials, <br />systems, details of construction, and known or anticipated changes in the bidding market relative to <br />The project. <br />Project required tasks shall include, but may not be limited to: <br />• Plans and Spccifiartions (Contraci Documents) shall be reviewed at 851;, and I00°/.. <br />• Updated Cost Estimate shall be provided. Project phasing may need to be considered and <br />Contract Documents may need to be suventred accordingly pending available construction <br />funding. <br />• Review sets shall be provided in .pdf format. <br />• Final plans shall be provided in Micro Station VYi limnal and .pdt' formal. <br />City Council City of Santa Ana Rff 20-629 4/20/2021 <br />Page Al-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.