Laserfiche WebLink
Pacific Electric Bike Trail — Phase 2, Sandpointe Park <br />RFP No.20-129 <br />Pacific Electric Bike Trail Phase II <br />Preliminary Engineering <br />�® <br />72 <br />$9,624 <br />Design Development <br />117 <br />$13,827 <br />Construction Documents <br />198 <br />$15,591 <br />Bid Advertisement. Construction Administration, Record Drawings <br />36 <br />$4.663 <br />Reimbursables <br />$2,400 <br />Totals <br />353 <br />$46,035 <br />Sandpoint Park <br />Preliminary Engineering <br />HoursTask Total Team <br />21 <br />$2,666 <br />Design Development <br />51 <br />$5,728 <br />Construction Documents <br />53 <br />$6,321 <br />Bid Advertisement. Construction Administration. Record Drawings <br />16 <br />$1.901 <br />Reimbursables <br />$2,400 <br />Totals <br />141 <br />$19,016 <br />