My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL AGENDA PACKET_2021-04-20
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
04/20/2021 Regular
>
FULL AGENDA PACKET_2021-04-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2021 9:55:55 AM
Creation date
7/8/2021 4:33:46 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
4/20/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
423
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Electric Bike Trail — Phase 2, Sandpointe Park <br />IDS Group, Inc. <br />2020 Rate Sheet <br />Principal <br />Associate Principal <br />Senior Project Manager I Associate <br />Project Manager <br />Senior Architect or Engineer <br />Senior Cost Estimator <br />Project Architect or Fngineer <br />Designer Architect or Engineer <br />Engineering Designer- BIM <br />Two Man Survey Crew <br />Architectural Job Captain I Designer <br />CAD Drafting Engineer I Architect <br />Office Administration <br />RFP No.20-129 <br />$190 <br />$178 <br />$168 <br />$157 <br />$146 <br />$135 <br />$135 <br />$120 <br />$105 <br />$250 <br />$100 <br />$90 <br />$55 <br />Expenses such as, but not limited to, plan check fees, permits, inspections, testing services, title <br />company fees, special delivery charges, plotting/ presentation boards, maps, aerial photographs, and <br />reprographics/ illustrations that may be required for community or other stakeholder presentation, shall <br />be billed to the owner at Consultant's direct cost plus 5%. <br />
The URL can be used to link to this page
Your browser does not support the video tag.