My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL AGENDA PACKET_2021-04-20
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
04/20/2021 Regular
>
FULL AGENDA PACKET_2021-04-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2021 9:55:55 AM
Creation date
7/8/2021 4:33:46 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
4/20/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
423
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSULTANT SERVICES: <br />Consultant shall be responsible lox the preparation and Submittal of the I'SStF, package through <br />completion with the approval h-oun City to release fur eonsu-uction. Thin shall include, but not limited <br />to, survey, civil engineering, geotechnical investigation and repoit (tor suils analysis), electrical <br />engineering. Any additional tasks deemed necessary by the Consultant shall be clearly identified in <br />the proposal. <br />A. PROJECT COORDINATION. The Consultant shall be fully responsible for the overall <br />management and coordination for the project, which may include, but is not limited to project <br />development term meetings, liaison uith affected agencies, and utility companies- Prepare <br />progress report and sche(ule, securing permits for all field studies and any other required <br />permits from other agencies - <br />It. UTILITV COORDINATION. The Consultant shall be responsible for any necessary utility <br />coordination efforts, including but not limited to coordination with I-Aison for any electrical <br />service connections necessary for the project- <br />C. RECORDS RESEARCH. Research all information pertinctn to the project including, but not <br />limited to existing field condition, as -built plans and record drawings, right-of-way data and <br />all future improvement plans adjacent to or affecting the project site- The selected Consultant <br />shall identify all existing and proposed facilities within the project" limits and potential <br />conllicts. <br />1). SU1tVFV. Consultant shall identify in the proposal ifthe sunveywould include and the detail <br />ofthefealurestobesuiveyed. All survey and base mapping ofdneproject siteshalllie prepared <br />in US Customary English units by a California liccnscd Land Surveyor in accordance with the <br />City guidelines and in Microstation V8i Computer Aided design and Drafting (CADD) format. <br />The horizontal datum shall be NAD 83 and life vertical datum shall be NAVD 88. <br />F. PERMIT. The Consultant shall be responsible for identifying and applying for any necessary <br />permits- All permit requirements shall be added to the bid package for the project- <br />F. PLANS, SPECIFICATIONS, AND ESTIMATES (PS&E) <br />1. Development ol'Plans, Specitications and Estinnate (PS&E): <br />a) All reports, plans, specifications and quantity calculations shall conform to criteria. <br />policies, procedures and standards of the City. The Consultant shall use the <br />boilerplate for cut sheets, specifications and estimates provided by the City- <br />b) The plan developmenl shall include four(4) tmilestotie deliverables-30'/,,, 60'%,, 95"/„ <br />(pre -final) and 100% (final). All plan sheets shall be prepared at 20 scale unless noted <br />otherwise. I he necessary plans for each I'S&IS package shall include, but not limited <br />to: <br />City Council City of Santa Ana Rff 20fa30 4/20/2021 <br />Page Al -3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.