My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL AGENDA PACKET_2021-04-20
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
04/20/2021 Regular
>
FULL AGENDA PACKET_2021-04-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2021 9:55:55 AM
Creation date
7/8/2021 4:33:46 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
4/20/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
423
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I _ Title Sheet (City boiler template) <br />2. Trnprovcnicnis Plan (Layout, Pro[ilc) <br />3_ Construction Dcmils <br />4. Electrical Plan <br />5_ Landscape & Ti-rigation Plans <br />c) All calculations I'or the design and quantities shall be submitted as part of the PSBcE <br />submittal regtliremcnts. Qilantitics ti>r all cortuaut pay items shall be subshtntiated by <br />calculations. Quantity calculations shall be neat and orderly and shall show all <br />sketches, diagrams, and dimensions necessary to allow them to he independently used <br />by field inspectors daring construction_ All quantity calculations shall be <br />independently checked and substantiated with indcpendcru calculations. <br />d) Electronic files for all ('ADD (in Microstation VSi), reporrs, and calculations shall <br />he submitted at the end of the contract or v, lien requested by the City_ <br />c) All electronic software developed, databases generated, spreadsheets and intellectual <br />properties developed during the life of the Agreement shall become the properties of <br />the City. <br />2. DclivcrablcPS&Epackagc: <br />a) 30'10 PS&E <br />The package shall include the. concept layout of the proposed improvements <br />including boardwalk layout and material optioiis, planting (Calilbinia native or <br />drought tolerant plants), type of irrigation, and cost estimates. <br />h) 601/o, 90%, 100% PS&F, <br />1) The Consultant shall submit the following documents tot review and approval: <br />Each milestone submittal shall include the electronic files of the following <br />dOCtrnlem5: Plans, Standard Spccial Provisions (SSP), preliminary quantities <br />and estimates, pay item list, design calculations and all reports supporting the <br />design (i.e. geotechnical report, suvctural calculations). <br />2) The City review, and comments on the I'S&h: package within four (4) weeks <br />ol'receipl of the complete milestone PS&F package_ <br />3) ConsUvctabilit_y review meeting shall tale place at 90'% and shall include <br />C'onsull:lnl and City engineering stall. <br />City Council City of Santa Ana lffzt�aso 4/20/2021 <br />Page Al -4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.