My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL AGENDA PACKET_2021-04-20
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
04/20/2021 Regular
>
FULL AGENDA PACKET_2021-04-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2021 9:55:55 AM
Creation date
7/8/2021 4:33:46 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
4/20/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
423
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c) Final PS&F for Approval and Bidding <br />The Consultant shall submit one set of PDF of Lhc litllowim, doUurnenLh for <br />construction Bid purpose_ <br />Signed final design plaits <br />Signed final specifications <br />Final cost eSLimate & final quantiLy calculations (includinM derails of hnrop iiim ircnr5) <br />Final design calculations <br />3. Construction Iliddine Phases <br />Bidding procedures will be the responsibility of the City- While the PS&E construction <br />packagee is advertising for bids, all questions concerning the intent shall be referred to the <br />City for resolution. In the event that any item requiring interpretatiorr iri the drawings or <br />specifications is discovered during the bidding period, said items shall be analyzed by the <br />Consultant for decision by the City- <br />4. Construction Support Phases <br />a) This task shall be included as optional in the fee proposal. <br />b) Consultant shall furnish, at the consuhant's sole cost and expense, all nccessary <br />revised documents and drawings duee to errors and omissions of the Consultant. <br />c) Consultant shall review and approve all submittals and shop plan drawings required <br />to support the consu-uction cone -act- ConsultanL shall complete shop drawings <br />reviews within two (2) weeks of receipt. Contract Change Order reviews shall be <br />completed within two (2) working days of receipt. <br />(l) Consultant shall he available as requested by the City to resolve discrepancies in the <br />contract docLunents- Consultant shall bring to the attention of the City any defects or <br />deficiencies in the work by the construction contrac[ol which the Consultant may <br />observe. Consultant shall have no authority to issue instltction on behalf of the City, <br />or to deputize ;another to do so. <br />c) The Consultant shall prepare and deliver to the City the final as -built plans <br />incorporating field marked prints supplied by the City. Upon completion of <br />construction, the City will submit field -marked prints toConsultant. Consultant shall <br />incorporate all changes to the plans electronically with all necessary revision <br />notations and submit to the CiLy. <br />City Council City of Santa Ana Fff 20F630 4/20/2021 <br />Page Al -5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.