Laserfiche WebLink
ci IA.I E IN E: P•1-1 DUAL IFI CA -I 10 PI c; <br />U IN DIERSTAIN I II ING OF IN IE: I; I <br />Quality Control - Like any design firm we understand that <br />we're only as good our projects, and those are only as good <br />Dur drawings. During the design and construction docurnent <br />phase we will have our own internal learn schedule for each <br />discipline. They will be required to provide us their drawings <br />ahead of any city submittal so that our in-house design <br />team can review and provide redline comment back prior <br />to said submittal. In addition, our internal OAOC team will <br />scan the drawing sets at each milestone Submittal for errors, <br />omissions, coordination issues, etc. Our expertise in detailing <br />and construction processes will help us anticipate issues <br />that could be discovered in the field so we can update the <br />drawings to reflect all the scope required by the contractor. <br />vii. Suggestions / Special Concerns — We're just <br />corning into this project SO we Still have a lot of catching up to do. <br />The City and it's Staff has been dealing with the site for some time <br />so we understand there is a mountain of things we're not up to <br />speed on regarding the history of the project and the history of the <br />concept that was used to secure the grant money. We make the <br />following suggestion based purely on what we saw during our site <br />visit and our understanding of what the City finds exciting )hour <br />this project. The overlook deck and triangle site is mostly intended <br />to be a rest stop for bikers that are using the extensive Santa Ana <br />River Trail System. We think the current layout of the deck misses a <br />great opportunity to make this intent more clear. The current triangle <br />shape is a reflection of the property lines which are a bit arbitrary. <br />It's nice that the deck extends out into the landscape area as an <br />overlook but it doesn't connect well with it's surrounding. Just on the <br />other side of the bike trail is a huge steel frame and wood bridge, <br />spanning 30OFT and making a connection across the channel to <br />Edna park and existing residenlial. In lerms of scale, [his IS [he most <br />interesting thing happening in the area. We think having the layout <br />of the re -built deck react directly to the bridge makes more sense <br />and will create a more meaningful Stopping point. This would give <br />users a chance to sit and watch passersby on the bike path and view <br />the bridge and channel as well. They may not be the prettiest thing <br />in the world, but the bridge and channel are feats of engineering <br />and the scale of both is eye catching. A portion of the deck can still <br />extend out into the riparian landscape but with a change in how <br />the deck abuts the edge of the bike path can make it more open, <br />inviting, and feel more connected to its surroundings. We've taken <br />the liberty of providing a sketch of what this could look like. <br />A CONTINriOUs EDGE <br />ALONG THE BIKE PATH <br />_IKE THIS ALLOWS FOR <br />MORE INVITING PJL'_ IN <br />FOR BIKERS TRAVELING <br />NORTI I AND SOUTI I <br />A'_ONG THE EAST SIDE <br />OF IHE CHANNEL. <br />A CONTINUOUS EDGE <br />A'_ONG THE BIKE <br />PATH ALSO PROVIDES <br />OPPORTLNITIFS FOR <br />SEATING THAT VIEWS THE , <br />BIKE PATH AND BRIDGE/ <br />C'.. IANNEL WITI I TI IE PARK <br />AND MOLNTAINS IN THE <br />DISTANCE TO THE NORTH. <br />BECAUSE DECK IS <br />ELEVATED ABOVE FINISH <br />GRADE, IT ALLOWS FOR <br />SPECIMEN TREES TO <br />BE P-ANTED CLOSE TO <br />THE EDGE AND PROVIDE <br />ARLOI SHAUL OVER <br />SEATING AREAS. / <br />Idur) .w <br />1� �1 Mlll�iw�••'�� <br />a <br />66 SHAPE CF DECK CAN BE AN <br />r1 Sr EXTENSION OF THE EXISTING <br />4,��1/'1, BRIOU. IHAI SHANj IHo <br />CHANNEL. THIS CREATES A <br />,nr BETTER VISUA_ RE'_ATIONSHIP <br />FUR THOSE COMING TO THE <br />SITE FROM EDNA PARK. <br />I <br />BECAUSE DECK IS <br />�1. ( ELEVATED ABOVE <br />y FINISH GRADE. <br />k IT ALLOWS FOR <br />v°1 li SPECIMEN TREES <br />ATM° it O BE PLAN IED <br />q" .try CLOSE TO THE <br />EDGE AND PROVIDE <br />1 DIRECT SHADE OVER <br />SEATING AREAS. <br />LARGE BOJLDERS PLACED <br />BENEATH NEW DECK DETER <br />ENCAMPMENTS BECAUSE <br />NO'_EVEL GROUND FOR <br />SPREADING OUT TENT. <br />City Council 23 — 33 4/20/2021 <br />is <br />- / r /.A 0/, KY M1 211q?G <br />1/' SIrto. IKIAN.;LAK AKK rtMS 9KA'.,InN <br />