Laserfiche WebLink
POLICY NUMBER: LA20CGLZ04TP71C <br />COMMERCIAL GENERAL LIABILITY <br />NPC 711 0811 <br />THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. <br />GENERAL AGGREGATE LIMIT PER PROJECT WITH AN <br />OVERALL GENERAL AGGREGATE CAP <br />This endorsement modifies insurance provided under the following: <br />COMMERCIAL GENERAL LIABILITY COVERAGE PART <br />SCHEDULE <br />Designated Construction Projects: All Projects <br />Overall General Aggregate Cap: $5,000,000 <br />(If no entry appears above, information required to complete this endorsement will be shown in the Declarations <br />as appi came to rnis enaorsemenr.) <br />A. For all sums which the insured becomes legally <br />obligated to pay as damages caused by 'occur- <br />rences" under COVERAGE A (SECTION 1), and <br />for all medical expenses caused by accidents <br />under COVERAGE C (SECTION 1), which can be <br />attributed only to ongoing operations at a single <br />designated construction project shown in the <br />Schedule above: <br />1. A separate Designated Construction Project <br />General Aggregate Limit applies to each des- <br />ignated construction project, and that limit is <br />equal to the amount of the General Aggregate <br />Limit shown in the Declarations. Subject to <br />the application of the General Aggregate Limit <br />to each of your projects, the maximum <br />amount we will pay under the General Aggre- <br />gate Limit for all claims arising from all <br />projects is the Overall General Aggregate Cap <br />shown in the Schedule above. <br />2. The Designated Construction Project General <br />Aggregate Limit is the most we will pay for the <br />sum of all damages under COVERAGE A, <br />except damages because of "bodily injury' or <br />"property damage" included in the "products - <br />completed operations hazard", and for medi- <br />cal expenses under COVERAGE C regard- <br />less of the number of: <br />NPC 711 08 11 <br />a. Insureds; <br />b. Claims made or "suits" brought; or <br />C. Persons or organizations making claims or <br />bringing "suits'. <br />3. Any payments made under COVERAGE A for <br />damages or under COVERAGE C for medical <br />expenses shall reduce the Designated Con- <br />struction Project General Aggregate Limit for <br />that designated construction project. Such <br />payments shall not reduce the General Ag- <br />gregate Limit shown in the Declarations nor <br />shall they reduce any other Designated Con- <br />struction Project General Aggregate Limit for <br />any other designated construction project <br />shown in the Schedule above. <br />4. The limits shown in the Declarations for Each <br />Occurrence, Fire Damage and Medical Ex- <br />pense continue to apply. However, instead of <br />being subject to the General Aggregate Limit <br />shown in the Declarations, such limits will be <br />subject to the applicable Designated Con- <br />struction Project General Aggregate Limit. <br />e. <br />RideMarugemme DWian <br />WVPXED6APPR MBY: <br />U' <br />Risk edanagem nt Analyst <br />