My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CROSSTOWN ELECTRICAL & DATA, INC. (2)
Clerk
>
Contracts / Agreements
>
C
>
CROSSTOWN ELECTRICAL & DATA, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 3:49:00 PM
Creation date
7/13/2021 3:06:41 PM
Metadata
Fields
Template:
Contracts
Company Name
CROSSTOWN ELECTRICAL & DATA, INC.
Contract #
A-2017-172-02
Agency
Public Works
Council Approval Date
6/5/2017
Destruction Year
2027
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. For all sums which the insured becomes legally <br />obligated to pay as damages caused by 'occur- <br />rences" under COVERAGE A (SECTION 1), and <br />for all medical expenses caused by accidents <br />under COVERAGE C (SECTION 1), which cannot <br />be attributed only to ongoing operations at a sin- <br />gle designated construction project shown in the <br />Schedule above: <br />1. Any payments made under COVERAGE A for <br />damages or under COVERAGE C for medical <br />expenses shall reduce the amount available <br />under the General Aggregate Limit or the <br />Products -Completed Operations Aggregate <br />Limit, whichever is applicable; and <br />2. Such payments shall not reduce any Desig- <br />nated Construction Project General Aggre- <br />gate Limit. <br />C. When coverage for liability arising out of the <br />"products -completed operations hazard" is pro- <br />vided, any payments for damages because of <br />"bodily injury" or "property damage" included in <br />the "products -completed operations hazard" will <br />reduce the Products -Completed Operations Ag- <br />gregate Limit, and not reduce the General Aggre- <br />gate Limit nor the Designated Construction <br />Project General Aggregate Limit. <br />Page 2 of 2 <br />D. If the applicable designated construction project <br />has been abandoned, delayed, or abandoned <br />and then restarted, or if the authorized contract- <br />ing parties deviate from plans, blueprints, de- <br />signs, specifications or timetables, the project will <br />still be deemed to be the same construction <br />project. <br />E. The provisions of Limits Of Insurance (SECTION <br />III) not otherwise modified by this endorsement <br />shall continue to apply as stipulated. <br />WekM�gementlNWalun <br />.t Y�a_•.y,: rrp REmEwED& APPPIRW BY: <br />e <br />gq�wm_ Rtsk Management Analyst <br />
The URL can be used to link to this page
Your browser does not support the video tag.