Laserfiche WebLink
Kleinfelder Statement of Qualifications for On -Call Material Testing and Special Inspection Services <br />for City of Santa Ana, RFP No. 20-111 <br />Laboratory test reports will be forwarded electronically to the City's representative and designated <br />team members. Our laboratory test results will be submitted in accordance with the time frames listed <br />in the City's RFQ Section titled Reporting Test Results. A final report will be prepared for materials <br />testing and inspection services, summarizing the observations and testing made in the field and <br />laboratory, and providing conclusions for suitability and recommendations. This final report will be <br />submitted to the City within five working days upon completion of each project. <br />Commitment to Safetv <br />Kleinfelder employs the LPSO (Loss Prevention System) program in all of our work practices. The <br />basis of LPS is reducing losses (both safety and financial) by identifying unsafe conditions or <br />behaviors and providing the means to mitigate them. Kleinfelder's adoption of the LPSO system has <br />resulted in a total recordable incident rate (TRIR) of 0.40, the lowest in Kleinfelder's history. <br />Kleinfelder is proud to have integrated the LPSO system into our culture, and we believe it sets our <br />firm apart from our competitors by taking a more focused and proactive approach to safe work <br />practices and empowering each employee to identify potential hazards and make safer choices. <br />e. Relevant Project Experience <br />Client: OCPW <br />Fee: $1.5M <br />Duration: 2015 - Ongoing <br />Reference: <br />Vinh Tran, PE, Senior Engineer <br />714.955.0210 <br />vinh.tran@ocpw.ocgov.com <br />Relevance to this Contract: <br />• Materials testing and <br />inspections <br />• Laboratory testing <br />• Public structure improvements <br />• Geotechnical engineering <br />review of contractor submittals <br />Key Staff <br />• Dany Hanna, PE, MS, MBA <br />• Mike Dorsch <br />• James Stiady, PhD, PE, GE <br />• Rick Bell <br />• Bryan Reese, ASP <br />• Eddie Jabbour <br />• Juan Le Roy <br />• Jeffrey Diaz <br />• Cameron Massa <br />• Ali Rehman <br />• Tom Rebosky <br />• Shawn McLaren <br />• Sage Dempsey <br />• Michael Magana <br />• Dominic Montemayor <br />• Christian Castanar <br />• Edmond Jabbour <br />Kleinfelder is currently providing construction inspection, <br />geotechnical engineering, and materials testing and inspection <br />services for OCPW under the management of Mr. Dany Hanna, PE, <br />MS, MBA. <br />Under on -call contract, Kleinfelder is providing materials testing and <br />inspection services in support of the OCPW QA program for <br />construction of new or rehabilitation of existing roadways, flood <br />control channels, parks, or other infrastructure projects. All testing is <br />performed in accordance with OCPW Standards and Procedures <br />using CTM, ASTM, and/or AASHTO-AMRL testing. Kleinfelder <br />complies with the County of Orange Standard Plans, Greenbook <br />Specifications, Caltrans, ASTM, AASHTO-AMRL, and APWA <br />Standards. In addition, Kleinfelder's material testers, inspectors, and <br />laboratories are certified with Caltrans, CCRL, AASHTO-AMRL <br />resource accreditation, and ASTM D3666. Kleinfelder also complies <br />with all applicable requirements of the California Construction and <br />General Industry Safety Orders, the California Occupational Safety <br />and Health Act (Cal -OSHA), County of Orange's Safety and Loss <br />Prevention Program and all applicable laws and regulations. <br />Oso Parkway Bridge Replacement, Aliso Viejo. This project <br />consists of the removal, relocation and adjustment of existing <br />improvements, excavation and grading, removal and relocation of <br />existing utilities, construction of new storm drainage and storm water <br />pre-treatment and storage system, construction of curb, gutter and <br />pedestrian walkways and ramps, bridge construction, roadway paving <br />and new overhead signage and traffic control devices. Under the <br />leadership of Task Order Manager Rick Bell, Kleinfelder has <br />performed concrete batch plant inspections, PCC aggregate sampling <br />and testing, and onsite flexural beam fabrication and laboratory testing <br />per Caltrans test methods. Additionally, HMA batch plant inspections <br />occurred and Kleinfelder materials testers sampled the HMA, binder, <br />and aggregates for testing in our Caltrans accredited laboratories. <br />1,1 --I 1'401F <br />Kleinfelder 110 KLE/NFELOER <br />