Kleinfelder Statement of Qualifications for On -Call Material Testing and Special Inspection Services <br />for City of Santa Ana, RFP No. 20-111 <br />APPENDIX A <br />CML/CMC water pipe as well as installation of various fire hydrants, butterfly valves, blow -off <br />assemblies and air release and vacuum valve assemblies which required saw cutting and removal of <br />existing AC pavement, trench excavation, pipe and assembly installation and backfill and placement of <br />new AC pavement. The finished roadway within the utility trench consisted of 8 inches of AC over a 10- <br />inch section of aggregate base. The project was completed on time and within budget. <br />Caltrans SRL, Contract 08A2958 (Prior Contract 08A2541), On -Call Materials Sampling and <br />Testing Support Services for Projects Located in Caltrans Districts 7, 8, and 12, Southern CA. <br />Consultant Task Order Manager/QA Manager. Three-year on -call contract for sampling and <br />laboratory testing of HMA and aggregate materials. Mr. Bell oversees the Kleinfelder team internal <br />training and certification process and assists Kleinfelder's contract manager with monthly billing and <br />staffing projections. In addition, Mr. Bell developed a project -specific safety program to be used in <br />conjunction with Caltrans safety procedures for testers working at Caltrans' SRL. <br />City of Burbank, Annual Street Rehabilitation Program - Construction Inspection, Burbank, CA. <br />Quality Assurance Manager/Project Manager. Oversaw construction inspection services during <br />rehabilitation of 27 lane miles of residential streets. The project comprised construction of new ADA <br />ramps to meet code requirements, a 1.5-inch grind and overlay of existing asphalt concrete <br />pavement, and removal and replacement of curb and gutter at various locations. Documented daily <br />construction activities and performed quantity calculations and pay application reviews on behalf of <br />the city for final acceptance by the city engineer. Mr. Bell provided recommendations on how best to <br />utilize the project bid item for contractor quality control, and the city utilized these recommendations <br />as suggested to monitor the contractor's means and methods during construction activities. <br />Caltrans District 7, Contract 07A4733 (Prior Contract 07A4077), On -Call Construction Materials <br />and Testing Services, Los Angeles and Ventura Counties, CA. Quality Assurance Manager for as - <br />needed services to improve the State transportation system throughout Caltrans District 7. Performs <br />and oversees construction materials observation; materials testing per CTMs and Caltrans <br />Construction Manual; field sampling of fresh concrete, HMA, soil, and aggregate; field nuclear gauge <br />compaction testing; special materials analysis and evaluation; materials documentation and <br />information; and preparation of reports to Caltrans Standards and requirements. <br />County of Riverside Transportation Department, On -Call Highway Geotechnical Engineering <br />and Materials Evaluation and Testing Services, Riverside County, CA. Project Manager/Quality <br />Assurance Manager responsible for construction inspection and materials testing oversight, <br />training, and cost controls. Maintains communications with County project Resident Engineers and <br />inspection staff to identify project -specific needs during construction activities for projects falling <br />under Caltrans jurisdiction. Assists the County with scheduling and dispatching of appropriate <br />Kleinfelder testers and inspectors and maintains summaries of QA test results for ongoing projects <br />involving Kleinfelder laboratories and materials testers. Additionally, Mr. Bell has assisted the <br />County's project Resident Engineer during the preparation and approval processes associated with <br />a required Source Inspection Quality Management Plan (SIQMP) and project closeout reports. <br />Asphalt Rubber HMA (ARHM) Designs, County of Los Angeles Department of Public Works, <br />CA. Quality Assurance Manager. Provided laboratory ARHM-GG-C mix proportions (with and without <br />15% RAP) on materials collected from three separate Los Angeles County material suppliers. The <br />purpose was to verify existing ARHM-GG-C job mix formula (JMF) proportions currently being <br />provided to the County; investigate the suitability of a 15% recycled asphalt pavement (RAP) <br />replacement in each JMF, and check the binder properties of the RAP collected from each of the <br />three plant locations sampled. Provided material sampling and laboratory mix proportion utilizing <br />aggregates, RAP, and PG 64-16 asphalt rubber binder collected during routine production of ARHM <br />asphalt concrete at each of the three batch plants selected. Laboratory testing included California <br />Test Numbers 304, 308, 309, and 366. <br />�lttEINFELPFR <br />Mw2ID92.4001P Rick Bell 12 ``-' <br />