Laserfiche WebLink
Kleinfelder Statement of Qualifications for On -Call Material Testing and Special Inspection Services <br />for City of Santa Ana, RFP No. 20-111 <br />APPENDIX A <br />as Task Order Manager for this as -needed contract with the County of Los Angeles for federally and <br />non -federally funded projects. Kleinfelder provided materials observation, field inspection and <br />testing, and laboratory testing services for various projects throughout the County of Los Angeles. <br />The federally funded projects consisted of asphalt concrete pavement grind and overlay, <br />reconstruction of concrete curbs and gutters, sidewalks, median islands, curb ramps, driveway <br />approaches, alley intersections, and other appurtenant work. Kleinfelder's services were performed <br />in accordance with the County of Los Angeles QA Plan and the Caltrans Specification Section 39 <br />(asphalt concrete). Kleinfelder provided asphalt concrete observation and testing services at the <br />production plant and job site, as well as construction materials laboratory testing services at our <br />laboratory facilities. <br />Caltrans District 8, (Contract 08A2768), On -Call Materials and Testing Services, Riverside <br />and San Bernardino Counties, CA, Mr. Dorsch serves as Task Order Manager responsible for QA <br />materials testing and inspection services to improve the State transportation system throughout <br />Caltrans District 8 (covering Riverside and San Bernardino Counties). He provides oversight of field- <br />testing services performed at numerous project sites and material supplier batch plants. Mr. Dorsch <br />is responsible for project scheduling and field coordination, review and distribution of daily field <br />reports, providing materials documentation and information, and preparation of reports to Caltrans <br />Standards and requirements. He reviews and processes timesheets and expense reports directly <br />relating to the implemented Caltrans procedures for the contract. <br />1-405 Sepulveda Pass Widening, Los Angeles, CA. Mr. Dorsch served as QA Project Manager <br />tasked with the oversight of field and batch plant inspectors for the design -build project which <br />involved constructing one 10-mile high -occupancy vehicle (HOV) lane northbound on Interstate-405 <br />from Interstate-10 to US-101. The project realigned existing on and off ramps, reconstructed 23 <br />bridges and ramp structures, built approximately 18 miles of retaining walls, and added road <br />improvements on the adjacent city streets. He was responsible for review and distribution of daily <br />field reports, tracking material quantities, and implementing the laboratory testing program. Mr. <br />Dorsch dispatched and scheduled inspectors for multiple scopes of work. <br />Los Angeles World Airports (LAWA) Specialty Staff and Materials Testing Services, Los <br />Angeles, CA. Mr. Dorsch serves as Operations Manager and the primary point -of -contact to <br />coordinate Kleinfelder's services with LAWA's Quality Assurance Program Manager and the Quality <br />Assurance & Construction Inspection Division for this large-scale $14B construction program. He is <br />responsible for the performance of the Kleinfelder Team which includes a group of 19 subconsultants <br />who act as an extension of LAWA's QACID by providing inspectors and specialty staff to augment <br />LAWA's inspection group under the direction of Chief Construction Inspector Mr. Gerardo Lopez and <br />his assigned Principal Inspectors. The Kleinfelder Team worked around -the -clock performing Deputy <br />Building Inspection, MEP Inspection, Security Inspection, Construction Escort Staffing, Project <br />Inspection Office Engineering, Knowledge Management, and providing Construction Management <br />Interns to help achieve LAWA's overall goal of delivering these complex projects on schedule and <br />within budget. <br />Caltrans District 7 (Contract 07A4733), On -Call Construction Materials and Testing Services, <br />Los Angeles and Ventura Counties, CA. Mr. Dorsch serves as Consultant Task Order Manager <br />for this contract which includes as -needed construction field materials testing services to improve <br />the State transportation system throughout Caltrans District 7 at numerous project sites. Services <br />include the following: construction materials observation; materials testing per CTMs and Caltrans <br />Construction Manual; field sampling of fresh concrete, HMA, soil, and aggregate; field nuclear <br />gauge compaction testing; special materials analysis and evaluation; materials documentation and <br />information; and preparation of reports to Caltrans Standards and requirements. Mr. Dorsch <br />ensures the timely delivery of task order requests throughout the project duration, scrutinizes <br />budgets, and maintains scheduling and safety objectives. <br />fKLflNFELOSR <br />NIW210924001P Mike Dorsch 12 <br />