My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLEINFELDER INC.
Clerk
>
Contracts / Agreements
>
K
>
KLEINFELDER INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 11:53:59 AM
Creation date
7/16/2021 11:49:26 AM
Metadata
Fields
Template:
Contracts
Company Name
KLEINFELDER INC.
Contract #
A-2021-121-02
Agency
Public Works
Council Approval Date
7/6/2021
Expiration Date
7/5/2024
Insurance Exp Date
1/1/1900
Destruction Year
2029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kleinfe/der Statement of Qualifications for On -Call Material Testing and Special Inspection Services <br />for City of Santa Ana, RFP No. 20-111 <br />APPENDIX A <br />• MLK Medical Center Campus, Outpatient Center Central Sterile Renovation Project <br />• Agricultural Commissioning Weights and Measures (ACWM) Carport Facility/Shelter <br />Martin Luther King, Jr. (MILK) Medical Center Campus, East Parking Structure, Los <br />Angeles County, CA. Mr. Kennedy served as Special Inspector/Technician on this 6-level <br />parking garage project with 1,400 parking spaces to meet current parking challenges, <br />constructed of cast -in place concrete with post -tensioned decks and beams. Kleinfelder <br />provided special inspection and materials testing for the project. <br />Rancho Los Amigos National Rehabilitation Center (RLANC), Los Angeles County, CA. <br />Mr. Kennedy served as Kleinfelder's Lead Project Inspector. The $418M project includes new <br />elements and upgrades to existing structures. The County of Los Angeles required IOR for <br />OSHPD and jurisdictional inspection services at the project site, which were included as a <br />part of our contract. On -site work has included coordination of inspection staff and laboratory <br />testing of construction materials and workmanship, including soils, reinforced concrete, <br />prestressed/post-tensioned concrete, structural masonry, spray -applied fireproofing, structural <br />bolting and structural steel and welding. Additionally, the project includes demolition of <br />existing aged structures. As Lead Project Inspector, Mr. Kennedy coordinated all special <br />inspection activities and provides technical support and documentation to contractors when <br />issues arise during construction. <br />Administrative Office of the Courts, San Bernardino Courthouse, San Bernardino, CA. <br />Mr. Kennedy served as the Lead Inspector for the construction of a new, 11-story courthouse <br />that occupies approximately seven acres of land. Special inspection services included <br />reinforced concrete, reinforcing steel, observation during placement of drilled in anchors and <br />epoxy rebar, structural masonry, spray applied fire resistant materials, structural steel and <br />welding. As the Lead Inspector, Mr. Kennedy proved to be a valuable resource, not only <br />coordinating all special inspection activities but also providing technical support and <br />documentation to contractors when issues arose during construction. <br />Site 1 Demolition and Make -Ready Project at the RLANC, Los Angeles County, CA. Mr. <br />Kennedy served as Kleinfelder's Lead Project Inspector. The project included the demolition <br />of existing OSHPD facilities and reconstruction of several new buildings and expansion of the <br />existing parking structure. As Lead Project Inspector, Mr. Kennedy coordinated all special <br />inspection activities. <br />ryrti <br />MW210924.001P Eric Kennedy 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.