Kleinfelder Statement of Qualifications for On -Call Material Testing and Special Inspection Services
<br />for City of Santa Ana, RFP No. 20-111
<br />APPENDIX A
<br />Kim Byrd, ICC, ACI
<br />License / Certification
<br />Inspector
<br />ACI Field Testing
<br />Technician
<br />Mr. Byrd has 38 years of experience in construction related
<br />ICC Special Inspector:
<br />employment including 20 years as a certified special inspector
<br />Reinforced Concrete,
<br />with substantial knowledge of building code interpretation/
<br />Prestressed Concrete,
<br />enforcement in structural steel welding, structural masonry,
<br />Structural Masonry,
<br />reinforced concrete, post-tensioned/pre-stressed concrete,
<br />Structural Steel and
<br />concrete sampling and testing, and ASTM standards. He has
<br />Bolting
<br />immense experience with OSHPD-related and facility renovation
<br />projects. Mr. Byrd has worked on the CMSC campus for the last
<br />County of Los Angeles
<br />12 years as Lead Special Inspector. Additionally, Mr. Byrd has
<br />Special Inspector:
<br />held a current County of Los Angeles Special Inspector
<br />Reinforced Concrete,
<br />Structural Steel/Welding
<br />Certificate since 2002.
<br />City of Los Angeles Deputy
<br />Mr. Byrd has worked on numerous public works facilities and
<br />Inspector: Concrete,
<br />related structures projects over the past several decades.
<br />Drilled in Anchors,
<br />Masonry, Steel/Welding
<br />Relevant Project Experience
<br />WABO Special Inspection
<br />County of Los Angeles, Numerous As -Needed Materials
<br />Field Supervisor:
<br />Testing and Special Inspection Contracts, Los Angeles
<br />Prestressed Concrete,
<br />County, CA. Since 2002, Mr. Byrd has served as Special
<br />Reinforced Concrete,
<br />Inspector/Technician on several County of Los Angeles as -
<br />Structural Masonry,
<br />needed, multi -year contracts. Additionally, Mr. Byrd has held a
<br />Structural Steel and
<br />current County of Los Angeles Special Inspector Certificate since
<br />Bolting, Structural
<br />2002. Under these contracts, Kleinfelder provided materials
<br />Welding
<br />observation and testing services for various public works facilities.
<br />Relevant public works and facility projects have included:
<br />Special Training
<br />Camp Miller, Juvenile Detention Center. Provided structural
<br />Loss Prevention System
<br />steel welding, reinforced concrete, and structural masonry.
<br />Safety Training
<br />Defensive Driver Training/
<br />Central Juvenile Hall. Provided structural steel welding,
<br />Driver's License
<br />reinforced concrete, and structural masonry.
<br />Years of Experience
<br />0Los Padrinos Juvenile Hall. Provided structural steel welding,
<br />38 years total
<br />reinforced concrete, structural masonry.
<br />20 years with Kleinfelder
<br />0Los Angeles County Courthouse, Santa Monica. Senior
<br />Inspector who provided structural steel welding, reinforced
<br />concrete, and structural masonry testing and inspection.
<br />Cedars -Sinai Medical Center (CSMC), Numerous Projects, Los Angeles, CA. Since 2008, Mr.
<br />Byrd has been the Lead Special Inspector on 150+ projects at the CSMC campus for various
<br />facilities totaling a construction value of $450M to date. He works full-time on the campus on new
<br />construction and facility renovation projects. As Lead Special Inspector, he also serves at the
<br />Point of Contact. He has worked closely with the [OR team to cover all work on the campus and
<br />directed additional special inspectors as necessary. Many of the projects fall in the jurisdiction of
<br />the OSHPD.
<br />Westfield Santa Anita Mall, Santa Anita, CA. Inspector -in -Charge, performing materials testing
<br />and inspection services for the mall expansion project. The project consisted of the construction
<br />of a parking structure and the addition of a new food court and retail stores. Kleinfelder provided
<br />deputy inspectors, and Mr. Byrd was the lead, coordinating a staff of 3 to 4 inspectors throughout
<br />the project.
<br />KLEINF£L
<br />Mw210924001P Kim Byrd 11 1
<br />
|