My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CHAMBERS GROUP, INC. (4)
Clerk
>
Contracts / Agreements
>
C
>
CHAMBERS GROUP, INC. (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2021 4:16:52 PM
Creation date
7/19/2021 3:58:14 PM
Metadata
Fields
Template:
Contracts
Company Name
CHAMBERS GROUP, INC.
Contract #
A-2021-110-02
Agency
Community Development
Council Approval Date
7/6/2021
Expiration Date
7/31/2022
Insurance Exp Date
5/12/2022
Destruction Year
2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFP #21-017: On -Call Environmental Review Services for the CHAMBERS <br />Housing Division <br />City of Santa Ana Community Development Agency GROUP <br />Dudley Street Multi -Family Residential Project, Pomona, CA <br />Prepared an air quality, energy, and GHG emissions impact analysis and a noise impact analysis for the development of <br />152 townhomes at 1440 Murchison Avenue. The air quality, energy and GHG report analyzed the regional construction <br />and operational air emissions with the CalEEMod model and utilized the SCAQMD Look -Up Tables for the localized <br />analysis. The analysis found that with adherence to State and SCAQMD regulations that air quality, energy and GHG <br />impacts would be less than significant. The noise report analyzed construction noise levels with the FHWA RCNM, <br />utilized the FHWA-RD-77-108 model to analyze the offsite roadway noise impacts from the project and utilized the <br />SounclPlan model to analyze the Freeway noise impacts to the proposed townhomes. The analysis found through <br />implementation of Project Design Features that included sound walls and upgraded windows and doors that noise and <br />vibration impacts would be less than significant. <br />Archstone Huntington Beach at Edinger Project, Huntington Beach, CA <br />Prepared an air quality and global climate change impact analysis for the development of four story residential <br />apartment building with 510 units, a central five story parking structure and amenities located on an 8.5 acres at Edinger <br />Avenue and Gothard Street that is within the Beach and Edinger Corridors Specific Plan (BECSP). The analysis utilized <br />CalEEMod to analyze the project's regional criteria pollutant and GHG emissions and SCAQMD's Mass Rate LST Look- <br />up Tables to analyze the project's local criteria pollutant impacts from construction activities. With implementation of <br />the required air quality and GHG mitigation measures provided in the BECSP, no significant construction or operational <br />impacts were found. <br />Washington Avenue Lot Well & Facility Project, Santa Ana, CA <br />Prepared an air quality and GHG emissions analysis and a noise impact analysis for the development of a water well, <br />well building and chemical building located on the northwest corner of Penn Way and Washington Avenue. The air <br />quality and GHG report analyzed the regional construction and operational criteria pollutant and GHG emissions with <br />the CaIEEMod model and utilized the SCAQMD Look -Up Tables for the localized analysis. The analysis found that the <br />project would result in lessthan significant air quality or GHG emissions impacts. The noise report analyzed construction <br />noise levels with the SounclPlan model that utilized reference noise measurements taken during active well <br />construction activities and from the FHWA's Road Construction Noise Model (RCNM). The noise modeling found that <br />there would be a significant noise impact during the well drilling phase of construction and the proposed mitigation of <br />a minimum 8-foot high wall around the project site was quantified with the SounclPlan model, which showed the <br />mitigation was adequate to reduce construction noise to within City noise standards. <br />813 N Euclid Street Gas Station Project, Santa Ana, CA <br />Prepared an air quality, energy, and GHG emissions analysis and a noise impact analysis for the development of a gas <br />station with eight fueling positions and a 3,045 square foot convenience store. The air quality and GHG report analyzed <br />the regional construction and operational criteria pollutant and GHG emissions with the CalEEMod model and utilized <br />the CAPCOA Gas Station Guidelines to calculate the VOC emissions created from the transfer and dispensing of gasoline. <br />The SCAQMD Look -Up Tables were utilized for the localized analysis and the SCAQMD's Risk Tool V1.103 was utilized <br />to calculate the cancer risk from gasoline dispensing activities at the nearby homes. The analysis found that the project <br />would result in less than significant air quality, energy or GHG emissions impacts. The noise report analyzed <br />construction noise levels with the FHWA RCNM, utilized the FHWA-RD-77-108 model to analyze operational vehicular <br />noise and utilized reference noise measurements of similar gas station facilities and typical noise propagation rates to <br />analyze noise impacts from the proposed project to the nearby homes. A significant nighttime noise impact was found <br />to be created by the proposed air/water machine and mitigation was provided that restricted the operation of the <br />Air/Water machine during the nighttime noise sensitive hours of 10 p.m. to 7 a.m. In addition, the noise analysis <br />analyzed construction and operation -related vibration impacts, which found that the proposed pile driving during <br />construction would create a significant vibration impact. Mitigation was provided that required the use of sonic pile <br />drivers. <br />Est <br />t A-34 <br />�ilP 1979 www.chambersgroupinc com <br />
The URL can be used to link to this page
Your browser does not support the video tag.