Laserfiche WebLink
Santa Ana <br />yVorks`Agency <br />21=036 -Sewer System Repair Services z <br />KEY PERSONNEL <br />Safety Director <br />Richard Sahag <br />Sit. Surs ay Managers <br />ProjectBnoneers <br />,Andrew hielendez <br />Santnsh Settapu <br />Vice Pre®dent <br />David Lee <br />Dirision Manger <br />shave Sato <br />(Contact Manager) <br />P.Ject Managers (I <br />Dazziel Chrordstar <br />Keith Fauts <br />Superintendents <br />B ob Faijo <br />Bryan Kitt <br />Du Gordon <br />Humberto Babaddla <br />Field Forres <br />David Lee — Vice President/Alternate Principal Agent; California Institute of Technology / <br />SVC-CE Program; SVC Project Management Certified; BS/Construction Engineering, <br />California State University, Long Beach, 1992; AA/General Education/Hartnell College, <br />1989; American Water Works Association and Southern California Water Utilities <br />Association. David has 29 years of experience, ranging from pipelines and treatment plants, <br />to roadways and underground utilities. His synergistic management expertise is based on <br />his working "both sides of the desk" in construction and design, having spent many years as <br />a tradesman. He has served as Project Principal, Project Manager and Estimator for <br />projects ranging from $5,000 water services to $90 million design -build efforts. <br />Shane Sato — Division Manager/Principal Agent; BS/Civil Engineering/University of <br />Hawaii at Manoa, 1996; Engineer in Training (EIT); Safety Trained Supervisor in <br />Construction (STSC); State of California Distribution Operator Grade D2; member SCWUA. <br />Shane has over 23 years of experience, ranging from pipelines and plants, to heavy civil, <br />highway infrastructure and underground utilities. He has worked on many various types of <br />construction projects throughout the country. In addition to managing the work he is <br />knowledgeable in managing labor forces, risk, maintenance programs, insurance, right -of - <br />Way acquisition, public relations, and scheduling. He has served as Project Manager, <br />Superintendent, Project Engineer, and Estimator for projects ranging from $1,000 repairs to <br />$1.75 billion design -build efforts. <br />W.A.HAnlr ion <br />