Laserfiche WebLink
W. A. Rasic Construction <br />4150 Long Beach Blvd. <br />Long Beach, CA 90807 <br />SCOPE OF SERVICES <br />CLIENT: The City of Santa Ana <br />PROJECT: Sewer System Repair Services - RFP No. 21-036 <br />WAR PROJECT NUMBER: S430A <br />Date: 19-Jan-21 <br />1 RepairlReplace 6 or 8" Sewer Main (min. 6' section up to 8' deep) 500 Linear Feet <br />1.1 Daily Traffic Control (Inc. road plates) <br />1.2 Sawcut AC <br />1.3 Excavation to Expose Line Break (6'-8' Deep) <br />1.4 Plug Broken Line at the Upstream Manhole <br />1.5 Suction Truck for Sewage Removal at Manhole & Excavation Site <br />1.6 Repair Line Break (Inc. pipe & fitting purchase) <br />1.7 Unplug Broken Line at the Upstream Manhole <br />1.8 1/2" Rock Bedding & SE30 Full Backfill (Sid. Plan 1150) <br />1.9 AC Restoration <br />1.10 Spoil Disposal <br />2 Repair/Replace 6 or 8" Sewer Main (6' section at 8'-12' deep) 250 Linear Feet <br />2.1 Daily Traffic Control (Inc. road plates) <br />2.2 Sawcut AC <br />2.3 Excavation to Expose Line Break (8'-12' Deep) <br />2.4 Plug Broken Line at the Upstream Manhole <br />2.5 Suction Truck for Sewage Removal at Manhole & Excavation Site <br />2.6 Repair Line Break (Inc. pipe & fitting purchase) <br />2.7 Unplug Broken Line at the Upstream Manhole <br />2.8 1/2" Rock Bedding & SE30 Full Backfill (Std. Plan 1150) <br />2.9 AC Restoration <br />2.10 Spoil Disposal <br />3 Repair/Replace 10 or 12" Sewer Main (6' section not more than 8' deep) 100 Linear Feet <br />3.1 Daily Traffic Control (Inc. road plates) <br />3.2 Sawcut AC <br />3.3 Excavation to Expose Line Break (6'-8' Deep) <br />3.4 Plug Broken Line at the Upstream Manhole <br />3.5 Suction Truck for Sewage Removal at Manhole & Excavation Site <br />3.6 Repair Line Break (Inc. pipe & fitting purchase) <br />3.7 Unplug Broken Line at the Upstream Manhole <br />3.8 1/2" Rock Bedding & SE30 Full Backfill (Bid. Plan 1150) <br />3.9 AC Restoration <br />3.10 Spoil Disposal <br />4 Repair/Replace 10 or 12" Sewer Main (6' section at 8'-12' deep) 100 Linear Feet <br />4.1 Daily Traffic Control (Inc. road plates) <br />4.2 Sawcut AC <br />4.3 Excavation to Expose Line Break (8'-12' Deep) <br />4.4 Plug Broken Line at the Upstream Manhole <br />4.5 Suction Truck for Sewage Removal at Manhole & Excavation Site <br />4.6 Repair Line Break (Inc. pipe & fitting purchase) <br />4.7 Unplug Broken Line at the Upstream Manhole <br />4.8 1/2" Rock Bedding & SE30 Full Backfill (Sid. Plan 1150) <br />4.9 AC Restoration <br />4.10 Spoil Disposal <br />