Laserfiche WebLink
5 <br />Remodel Manhole Base <br />10 Each <br />5.1 <br />Remodel Manhole Base <br />6 <br />Construct New Manhole (8' max depth) <br />50 Each <br />6.1 <br />Purchase New Frame & Cover <br />6.2 <br />Purchase Precast Shafting <br />6.3 <br />Daily Traffic Control (inc. road plates) <br />6.4 <br />Sawcut AC <br />6.5 <br />Excavation & 12" Rock Base (8' Deep) <br />6.6 <br />Construct CIP Manhole Base <br />6.7 <br />Install Precast Shafting & Set Frame & Cover <br />6.8 <br />SE30 Full Backfill (Std. Plan 1150) <br />6.9 <br />AC Restoration <br />6.10 <br />Spoil Disposal <br />7 <br />Construct New Manhole (8'-12' depth) <br />10 Each <br />7.1 <br />Purchase New Frame & Cover <br />7.2 <br />Purchase Precast Shafting <br />7.3 <br />Daily Traffic Control (inc. road plates) <br />7.4 <br />Sawcut AC <br />7.5 <br />Excavation & 12" Rock Base (8'-12' Deep) <br />7.6 <br />Construct CIP Manhole Base <br />7.7 <br />Install Precast Shafting & Set Frame & Cover <br />7.8 <br />SE30 Full Backfill (Std. Plan 1150) <br />7.9 <br />AC Restoration <br />7.10 <br />Spoil Disposal <br />8 <br />Raise Existing Manhole F&C & Replace Collar <br />30 Each <br />8.1 <br />Purchase New Frame & Cover <br />8.2 <br />Install Precast Shafting & Set Frame & Cover <br />8.3 <br />AC Restoration <br />9 <br />Replace Manhole Cover Concrete Collar <br />30 Each <br />9.1 <br />Replace Manhole Cover Concrete Collar <br />10 <br />Furnish & Install Traffic Loop <br />5 Each <br />10.1 <br />Install New Loop <br />11 <br />Provide Sewer Lateral Lining with Cleanout (4 or 6") <br />60 Each <br />11.1 <br />Sawcut & Remove Existing PCC Sidewalk <br />11.1.1 <br />Sawcut PCC Sidewalk <br />11.1.2 <br />Removal & Disposal <br />11.2 <br />Excavate & Remove Section of Lateral <br />11.3 <br />Shoot New Liner Material (Per Foot- 30' min section) <br />11.4 <br />Replace Section of Sewer Lateral & Provide New Cleanout <br />11.5 <br />Backfill, Compact & Install New PCC Sidewalk <br />11.5.1 <br />Backfill & Compaction <br />11.5.2 <br />New PCC Sidewalk <br />12 <br />Provide Top Hat Repairs (4 or 6" Sewer Lateral Pipe) <br />40 Each <br />12.1 <br />Purchase NewTop Hat <br />12.2 <br />Install Top Hat & Concrete Collar <br />13 <br />Provide Pipe Bursting Repair with Cleanout (4 or 6" Sewer Lateral Pipe) <br />25 Each <br />13.1 <br />Sawcut & Remove Existing PCC Sidewalk <br />13.1.1 <br />Sawcut PCC Sidewalk <br />13.1.2 <br />Removal & Disposal <br />13.2 <br />Excavate & Remove Section of Lateral <br />13.3 <br />Bursting Repair with Cleanout (4 or 6" Sewer Lateral Pipe) <br />13.4 <br />Replace Section of Sewer Lateral & Provide New Cleanout <br />13.5 <br />Backfill, Compact & Install New PCC Sidewalk <br />13.5.1 <br />Backfill & Compaction <br />13.5.2 <br />New PCC Sidewalk <br />