My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DOMINGUEZ GENERAL ENGINEERING, INC.
Clerk
>
Contracts / Agreements
>
D
>
DOMINGUEZ GENERAL ENGINEERING, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2021 10:14:12 AM
Creation date
8/17/2021 10:12:12 AM
Metadata
Fields
Template:
Contracts
Company Name
DOMINGUEZ GENERAL ENGINEERING, INC.
Contract #
A-2021-132-04
Agency
Public Works
Council Approval Date
7/20/2021
Expiration Date
7/19/2024
Insurance Exp Date
1/1/1900
Destruction Year
2029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dominguez General Engineering, Inc. <br />PO BOX 6234 ROSEMEAD CA, 01770 <br />PHONE 626442-7444 FAX 626-442.7277 <br />DOMiNourzoENERAL a@AOL.COM <br />n Progress: <br />Job name: Oncall Emergency Sewer Repair (In Progress) Supervised By Javier Mendoza <br />for City of Santa Ana 20 Civic Center Plaza, Santa Ana, CA. 92701 <br />Contract: 3 year contract 2012/2014 <br />Contacts Rudy Rosas at 714-647-3379 <br />Job Name; Emergency Sewer repairs Supervised Sy Javier Mendoza <br />Owner; City of FnDerion <br />Type work: Emergency sewer repairs 12/2014 <br />Contact Name: AnthonyReyuoso 714.738.6302or714-412-1116 <br />Cornpleted• <br />Job Name Bid Schedule 1314, Empire Center Sewer Relocation <br />City of Burbank275 E. Olive Ave, Burbank Ca. 91510 Supervised By Victor Dominguez <br />Type of Work: installation 6f 10",15" & 21' PVCPipe Approx. 1,936 LF. Construct New 48", 60" manholes, construct new <br />48", 60".mmrhole around existing pipe, Reconnect active sewer lateral, construct Storm drain squash box, removal and <br />replacement of existing 6" AC approx.. 3640 SF. Cap and grind 2" AC approx— 47,950, Curb, gutter and sidewalk <br />replacement, <br />Contract amount:1,295,450,00 completion date 12/5/2013 <br />Contact Person: Daniel J. Rynn PE 818-238-3940 inspector: Rick Wiggins 949-809-5000 cell 949-878-0154 <br />Job Name: Sower Improvement Santa Fe and Highland Ave Project#51003 <br />Owner: City ofPullerton <br />Type work: installation on 12"vop sewer 1150LF,15" VCP 305LF, abandon 12",8" and <br />6" sewer main, constroctl0-48" manholes,remove existing. manholes and install 6"VCP lateral connections _ <br />ContractAmount:394,070.00 Completed 8/3012010 <br />Contact Name: Al O'Balles Inspector 714-595-6718 Eric Villagracla assistant engineer 714-738-6845 <br />Job'Name; Syracuse Ave Storm Drain Supervised By; Victor Dominguez <br />Owner: City Of Baldwin Park <br />Type Of Work; Installation of 4811,42", 3611, 24" RCP Pipe, 28', 161, 14',wide Catch Basins, house connections; manholes <br />and concrete collars. <br />Contract Amount. $606,303.00 Completed 7/2009 <br />Contact: Edward Torres 626-960-4011 Engineering Assistant <br />Job Name: Civic Center Sewer Main supervised by; Adolfo Dominguez <br />Owner: City Of Santa Ana <br />Type Of Work: Construct 18", & 15" VCP Sewer Main, 611 and M. P.C,C, SewerManhote, <br />Contact amount; $800.000.00 Completed 9/06 <br />Contact Ed Tortes #714-647-5018 <br />Job Name: Bristol St. Storm Drain Supervised By; Adolfo Dominguez <br />Owner: City Of Santa Ana <br />Type "Work: Storm drain installation of 54", 48", ROP Pipe <br />Contract Amount: $1,625,274.00 Completed 4107 <br />Contact Ed Torres #714-647-5018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.