My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DOMINGUEZ GENERAL ENGINEERING, INC.
Clerk
>
Contracts / Agreements
>
D
>
DOMINGUEZ GENERAL ENGINEERING, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2021 10:14:12 AM
Creation date
8/17/2021 10:12:12 AM
Metadata
Fields
Template:
Contracts
Company Name
DOMINGUEZ GENERAL ENGINEERING, INC.
Contract #
A-2021-132-04
Agency
Public Works
Council Approval Date
7/20/2021
Expiration Date
7/19/2024
Insurance Exp Date
1/1/1900
Destruction Year
2029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Job Name: Magnolia Blvd Sanitary sewer Main Supervised By; Adolfo Aominguez <br />Owner: City of Burbank , <br />"type of Work: Sewer Replacement Contract Amount: $182,000,00 completed 7/2006 Contact: 818-238-3955 <br />lob Name: Contract#3840-0 sewer <br />Owner: City of Carlsbad <br />Type Of Work: <br />Construct 8" HDPE Sewer Pipe, 6" HDPE wet well, Curb and Gutter; <br />Contract amount: $199,201.00 completed 10/14/2005 <br />Contact: Kevin 11760.602.2720 <br />Job Name: Extension of Castle Storm brain <br />Owner: City Of La Canada Flintridge <br />Type of Work: Storm Drain installation. Installation of24' , 3611 ' 48", 51 ", RCP pipe house laterals, <br />construct concrete collars, junction structures and curb and gutters. <br />Contract Amount: $314,120.00 Completed 11/2009 <br />Contact: Nasser Shoushtarian 818-790-8882 Senior Civil Engineering <br />Job Name: Bristol St, Storm Drain <br />Owner: City Of Santa Ana <br />Type Work: Storm drain installation of 54}% 48", ROP Pipe <br />Contract Amount: $1,635,274.00 Completed 4/07 <br />Contact Ed Torres #714-647-5018 <br />Job Name; Tesquequite Sewer <br />Owner: City of Riverside <br />Type Work: Sewer Replacement 36" VCP -Case Bedding, manholes, sidewalk, curb and gutters, 81" <br />storm drain Removal, abandon sewer mains. <br />Contract Amount $939,668 Completed/2/0412006 <br />Contact: Daniel Ciaccella#951-826-5236 <br />"No Claims, Liquidated damages, Mediations, Arbitrations or Lawsuits" <br />All 100e/u constructed By Dominguez General Engineering, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.