Laserfiche WebLink
Type of Work: Installation of approximately 7,300 LF of W" DIP,, connection of mainlines to existing, installation of services, -Air <br />Vacs. Blow offs, Flow Control Saticn <br />Contract amount: $2,443,000 Completed 05/0512015 <br />Contact: Mayra Cabrera 951-739-4842 Supervised by JavierMendoza <br />Job Name; David Lane Pipeline Replacement <br />Owneri Eastern Municipal Water District, 2270 Tramble Rd. Perris Ca 92570 <br />Type of Work: Installation of approximately 1885 PVC; connection of mainlines to existing, installation of services, PRV's DCDA <br />and abandonment of 4" ACP pipe <br />Contract amount: 925,000 Completed 11129/2014 <br />Contact: Mario Rodriguez 951.300-3087 Supervised by Javier Mendoza <br />,fob name Waterline Replacements in alleys and Streets Project # 10094 <br />Owner: City of Beverly -Hills 345 Foothill Rd., Beverly Hills, CA, 90210 <br />Type of Wok: 13;527 LF, of 8" DIF class 52 push -o11 omts,2000 LF, of8"class 52 restrained joints, Valve box, reconnect oCrru <br />hydrants, fire services, domestic services, traffic meter boxes; sewer laterals, PCC alley approach, Polyethylene encasement around <br />pipe, <br />Contract: 0,296,500 Completion date:'7/31/2013 <br />Contact : Charles Gottlerlospector 310-925-0702 or Juan Martinez Civil Engineer Supervised by Victor Dominguez <br />Jab Name: Cast Iron Main Replacement <br />Owner; Long Beach water Department, 1800 R Waidlow Rd. Long Beach Ca, 90807 <br />Type of Work: Installation of 12" 4,920Lf, ,8" 360LF, 6"892LF, 4" 35LF Ductile Iron Pipe, installation of New Fire hydrants, <br />Butterfly Valves, New Valves, Copper Service Laterals,, 20" inch steel pipe casing, Blow off assembly, linestop, and pipe dewatering, <br />Contract; $2,109,125,93 <br />Contact: Wendy Chen civil Engineer 562-570-2324 Began: 5/11/2012 Ended 12/2012Supervised by: Victor Dominguez <br />Job Name: 12" inch Transmission Main Relocation <br />Owner: City of Seal Beach <br />Type of Work: installation of 12hteh Ductile iron pipe 479 Lf, installation of 2158 L£ Of Tit ilex restrained Joint Ductile iron Pipe, <br />new Fire hydrant assembly, Blow off assembly, 18ineh CML & Steel end cap and abandonment of 18 inch CML & Steel water main. <br />Contract: $453,094.00 <br />Contact: Torn Casulas 562-431-2527 Ext. 1346 'Began 5/1 i/2012 Ended 6/29/2012 Supervised by Adolfo Dominguez <br />Job Name, Water Main Improvement phase. 2 <br />Owner: City of Inglewood one Manchester Blvd. Inglewood CA. 90301 <br />Type of woric; furnish and install 8"(23101f)& 12" (36001f) D I P of 350 pipe, Installation ofR"(35) & 12"(34) GV, installation of <br />1"(92) and l y, "(3) services, Fire hydrants and `Tic -in works <br />Contract: $899,090,00 <br />Contact; BoytreseOsiasat310-412-533,3JoscRormirez,310-412�5333 began 2/6/2012Ended 5/25/2012Supervised byAdolfo <br />Dominguez <br />Job Name: Water system Improvement <br />Owner: City of Bell Gardens <br />8327 Garfield Ave, Bell Gardens, CA. 90201 <br />'hype of Work: installation of 6", 8", & 12" DIP class 5? Water main. Installation of 6" 8" & 12" Gate valve $ Box. Water service <br />connections for i' & T' services. New Fire hydrants <br />Contract; $730,229.00 completed 10/2011 <br />Contact: Aijan Aidnard #626-780-8154 project manager:/Sid Mou§avi'#562-806-7770Engineer <br />Supervised by Adolfo Dominguez <br />Job name Waterline Replacements in alleys and Streets Project 4 10091 <br />OwnerXity�of Beverly Hills. <br />345 Foothill Rd., Beverly Hills, CA. 90210 <br />Type Work: installation of 10,330 LF, of 8"ihch DIP class 52, push on joints, slurry installed, 9,034LF. of 8ineliDlp class52, <br />restrained joints, slurry in place, Polyethylene encasement around DIP, 36-SiuchTluderlly valve with valve box, Which and 16hocli <br />butterfly valve replacement, install and remove traffic rated deter box withboltect cover for 1" & 2" service, abandonment of <br />inteiferintg portions of 4", 6" & 8"pipc,T6rmodelsewer houae co ndoti0ns, reconstruct PCC alley Approach, linestop fort411 & 161, <br />butterfly valvereplacement, reconstruct 9 fire hydrants, re-eonneot 1,2,3 & 4 inch domestic services <br />