Laserfiche WebLink
Contract; $3,197,670,00 Completed; 7/8/2011 <br />Contacct Charles Gettler Inspector 310-925.07,02 or Juan Martinez Civil Engineer Supervise¢ by Victor pomi nguez.$c Adolfo <br />Dominguez <br />Job Name: Foothill Blvd, Water Improvement (Grand Ave to Cullen Ave) <br />Owner: City of Glendora <br />116 B. Poethlll Blvd, Glendora, CA. 91741 <br />Type Work: install 4699 If. Of 16" ductile iron pipe CL 350, 74 If. Of 30"steel pipe casing %`wall thickness under railroad way, 17 <br />of 16" butterfly valves, 10 6" fire hydrant assembly, 6" blow offs, 1" & 2" water service assemblies. <br />Contract: $1,276,752,00 <br />Contact: Civil Engineer Jason Roeglceboai 626-914-8253 cell 626.374-5336 Supervised by Adolfo Dominguez <br />Completed: 3/2011 <br />Job Name: Cast Iron Main Replacement— Artesia Blvd <br />Owner! Long Beach Water Department <br />1800 B.. Wardlow Dr„ Long Beach CA, 90807 <br />Typework, Furnish an install4",, 6", 81; & 12" Ductile Iron water ling installation of cooper service <br />Laterals, reconnections of services, fire hydrants, and installation of valves. <br />Contract: $1,665,824.82 completed: June 15„2010 <br />Contact: Azhar Khan 323.401-783C consultantongineer CI12MMill, Inspector Ed Mendoza 562-577-6560 <br />Inspector: Mike White 805-302-5375, Wendy Chen 562-570.2324 civil ongineer, Supervised by Adolfo Dominguez <br />Job Name: Alley Service Connection Conversion <br />Owner; Lang Beach Water Dpt. <br />1800 WardlowDR., Long Beach Ca, 90807 <br />Type of Work: 'I",2"; 3", water service connections, 4' , 6", and 8" DIP water Drain installation, hot tap including gate valves, and <br />fire service installation Contract: $729,950.00 completed: 9/2009 Contact: Ed Mendoza 562-5776560, Dave Stuetzel # 714-665- <br />4560, Supervised By Adolfo Dominguez <br />Job Name: 2008/2009 Water main Replacement <br />Owner. City Of Monterey Park <br />320 W. Newmark Ave, Monterey Park, CA. <br />Type of work (description): Installation of270L1. 12", 2520LF, 8" cement mortar ductile iron pipe with fittings and appurtenances. <br />Furnish and install new fire hydrants and connections. <br />Contract: $586,947.74 completed 3109/2009 <br />Contact: Vemiie Berniudoz Engineor#310-749-9309 <br />Adolph Villalpando 626-307.1294 Watcrll'istribution Supervisor, Supervised by Adolfo Dominguez <br />Job Name: Artesia Pilar Neighborhood Water main Improvements <br />Owner: City of Santa Ana <br />20 Civic center plazas, Santa Ann, CA, 92701 <br />Type of Work (description): installation of 7028L1; Of 12", 8560 Lt. 8", class200 AW WA c900, PVC water main. Construct water <br />services, fire line connections, And new firehydrantassembly <br />Contr•actAmount: $1,858,549.60 cotnploted: l/2009 <br />Contact: Ed Torres 4 714-647--5018 engineer cell 626-378-1372 ,Supervised By: Adolfo Dominguez <br />lob Name: Water Systemlmprovenient <br />Owner: City ofBeli Gardens <br />83270arfield Ave, Barfield CA. 90201 <br />Type Of Work, (description) installation of 40Le Of 6" DIP class 52,118OLF, 8" DIP class 52& 580U.. DIPclass52. Water service <br />corrections, gate valves, and box, new fire hydrants: <br />Contract Amount: $314,650.0 Completed 12/2008 <br />Contact: Adolph Villapando #562.322,5495 inspector (engineer no longer with the city) Supervised by: Adolfo Dominguez <br />Job No me: Edmonton Rd Water Main <br />Owner:. City of Glendale water and power <br />141 N Glendale Ave, Glendale, CA, 91206 <br />Type of Work description) install 8850Lf, Of 8" Pressure class 350 ductile iron pipe witlrfitthngs and appurtenances. D.urnishand <br />install copper tube services to new main, new fire hydrants, sewer laterals 8" & 6" gate valves, blow off assemblies, <br />