My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TRUSTAR ENERGY LLC
Clerk
>
Contracts / Agreements
>
T
>
TRUSTAR ENERGY LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2021 2:44:29 PM
Creation date
9/24/2021 2:42:59 PM
Metadata
Fields
Template:
Contracts
Company Name
TRUSTAR ENERGY LLC
Contract #
A-2021-147
Agency
Public Works
Council Approval Date
8/17/2021
Expiration Date
8/16/2022
Insurance Exp Date
6/2/2022
Destruction Year
2027
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. NFPA 79 - Electrical Requirements for Machinery <br />E. Occupational Safety and Health Administration (OSHA): <br />1. Title 29 Code of Federal Regulations <br />F. Department of Industrial Relations - California Code of Regulations (CCR): <br />1. CCR - Title 8, Industrial Relations <br />G. California Building Code (CBC) <br />H. California Fire Code (CFC) <br />I. California Electrical Code (CEC) <br />J. Occupational Safety and Health Association (OSHA) <br />K. American Gas Association (AGA) <br />L. American Petroleum Institute (API) <br />1.4 SUBMITTAL$ <br />A. General: Provide electronic submittals for distribution as follows: one for the City's <br />records, one for the City's Engineer, one for the Contractor and one for return with <br />comments to the vendor. <br />B. Shoo Drawings: Indicate piping system schematic with electrical and connection <br />requirements, general assembly of components, mounting and installation details, and <br />general layout of all control and alarm panels. <br />C. Product Data: System Components: Submit manufacturers' catalogue information <br />including capacity, component sizes, rough -in requirements, and service sizes. When <br />applicable, include electrical characteristics and connection requirements. <br />D. Calculations: Provide equipment run sheets or similar information to demonstrate <br />compliance with stated performance requirements for equipment. Provide anticipated <br />foundation loads and anchorage requirements for installation at the project site. <br />E. Acoustical Data: Provide test report data for acoustical enclosure to demonstrate <br />compliance with specifications. <br />1.5 QUALITYASSURANCE <br />City of Santa Ana- RFP 20-095 <br />CNG Fuel Station: Design, Build, Operate and Maintain <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.