My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ABM BUILDING SOLUTIONS, LLC (2)
Clerk
>
Contracts / Agreements
>
A
>
ABM BUILDING SOLUTIONS, LLC (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2022 9:11:49 AM
Creation date
9/28/2021 9:20:55 AM
Metadata
Fields
Template:
Contracts
Company Name
ABM BUILDING SOLUTIONS, LLC
Contract #
A-2021-162-02
Agency
Public Works
Council Approval Date
8/17/2021
Expiration Date
8/16/2024
Insurance Exp Date
11/1/2022
Destruction Year
2029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Check and use boiler viewport to check main burner flame as required. <br />5. Turn off and secure boiler as required. <br />6. Check boilers for any unusual noise or vibration as required. <br />7. Inspect gaskets for any signs of leaks as required. <br />B. Examine the venting system as required. <br />9. Remove and I or inspect gas pilot assembly, reinstall in accordance according to <br />factory specifications and tolerances. <br />10. Check boiler circulating pumps for proper operation and lubricate as required. <br />11. Check flame safeguard control for pilot and main flame Ignition as required. <br />12. Check operation of blower motor and circuitry as required. <br />13. Check operation of gas valves and vents as required. <br />14. Inspect and tighten all electrical connections as required <br />15. Check and adjust all boiler limit pressure controls and running interlocks as required. <br />16. Check operation and adjust low water controls as required. <br />17. Check burner, pilot and main flame ignition as required. <br />18. Check and oil combustion air fan as required. <br />19. Check expansion tank and site glass as required <br />20. Check and record all entering and leaving water temperatures and pressures as required <br />21. The equipment room shall be left in the same clean condition as existed prior to start of <br />the work. <br />22. Refer to equipment O&M manual for any maintenance clarifications. <br />Cooling Tower: <br />1. Provide four (4) quarterly inspections and maintenance. <br />2. Preventive maintenance as required. <br />3. Lock -out and Tag -out equipment as required. <br />4. Check starter contacts for excessive wear as needed. <br />5. Tighten all starter wire connections. <br />6. Check gear reducer and couplings. <br />7. Meg -Ohm motor and VFD's. <br />8. Check fan balance and motor(s) amps. <br />9. Clean and lubricate unit motor bearings and fan blades. <br />10. Check operation of media and flow. <br />11. Lubricate all dampers and linkages as necessary. <br />Chilled Water Pumps: <br />1. Check pump and motor operation. <br />2. Check fault history report as required. <br />3. Check and operate bypass valves. <br />4. Checks and verify strainers for optimum flow. <br />5. Check and tighten all electrical connections as required. <br />6. Check starter contacts for wear as required. <br />7. Check and record motor amp. <br />8. Lube and grease motor bearings as needed. <br />Johnson Controls: <br />1. Inspect and repair NCU 1 to NCU 12 for optimum operations, <br />2. Inspect and repair as needed 21 air handler controls and 46 VFD. <br />3. Inspect all damper motors controls and set points. <br />
The URL can be used to link to this page
Your browser does not support the video tag.