Laserfiche WebLink
TUSTIN AVENUEIROSE DRIVE <br />RTSSP GRANT APPLICATION OCTOBER 2019 <br />SECTION 7: DETAILED LOCAL MATCH COMMITMENT input 4 <br />-Auto•t'lilIII <br />m t r1 UNimHRY <br />Agency <br />CASH <br />IN -KIND <br />TOTAL MATCH <br />PI <br />OMM <br />PI <br />OMM <br />PI <br />OMM <br />City of Anaheim <br />118,412,50 <br />0.00 <br />0.00 <br />3,360.00 <br />1a8,412:50 <br />8,360.00 <br />118,41Y.50 <br />3,360.00 <br />�: 181r77,2,50 ' <br />City of Orange- <br />224,526,00 <br />12,000.00 <br />0.00 0.00 <br />¢24521fFP0 12�000.00. ' <br />- <br />236520.00 <br />'0.00 I <br />„,'L374,�20.00 <br />82017.50 <br />3,360.00 <br />0.00 0.00 <br />$2917.5¢ 3,60.00 <br />City of acen8a <br />8827T50 <br />- <br />0.00 - <br />' 86'27750, <br />73,54500 <br />2,360.00 <br />12,400.00 <br />1,000.00 <br />145 ¢541l� 3;7B000 <br />,-� <br />City of Santa Ana <br />•3 7. <br />75 805.0(l <br />13,400 00 <br />� -i 80 305 00 <br />30,22500 <br />- 1,440.11 00 <br />0:00 <br />0.00 <br />r3,¢F22500 l'Wo00 <br />City of Tustin <br />A <br />3166500 <br />0 00 <br />-: <br />3 31685 6044 <br />105�220.00 <br />2,40000 - <br />17,430.00 <br />0,00 <br />1221B50.00 290006 <br />City of Yorba Linda <br />107,620:00 <br />17 430 00- <br />125 060 UO . <br />83484000 <br />21,Sfi0.06- <br />29,83000 - <br />4,35000 <br />p64670-00 25,92000. <br />I <br />Agency I Funding Source I Amount of Cash <br />TOTAL CASH MATCH:._ <br />B. In -Kind Services <br />1. spec <br />..0 Improvements (List items and Cost): <br />Agency _ Description Expenditure <br />Total Specific Improvements (1): <br />It. Stang Commitment: <br />Agency <br />Staff Position <br />Type of Service to Project <br />No, of Hours <br />Fully Burdened <br />Hourly Rate <br />Total` <br />City of Santa Ana <br />Senlor Civil Engineer <br />g <br />rclect dmn a on, Quality suranpe <br />'sgnal Timing <br />50.0 <br />$86.93 <br />$4,346.50 <br />Assistant Engineer <br />Design PS&E <br />58.0 <br />$76.41 <br />$4,4S1.78 <br />Construction Inspector <br />Construction Inspection <br />60.0. <br />$58,21 <br />$3,492 60 <br />Engineering Intern <br />Design PS&E <br />61.70 <br />$18.30 <br />$1,12912 <br />Total (or City ol Santa Ana: 7$13,400.00 <br />Project Manager <br />PS&E, Traffic Signal Timing, Timing. <br />Impgmtradlon and Ststem integration Review,DA <br />18 <br />$165.00 <br />0 <br />$2,970.00 <br />70 Rev 1: 4/7/2021 <br />Page 17 of 23 <br />