My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL PUMP COMPANY, INC.
Clerk
>
Contracts / Agreements
>
G
>
GENERAL PUMP COMPANY, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2023 7:45:21 AM
Creation date
10/8/2021 4:01:24 PM
Metadata
Fields
Template:
Contracts
Company Name
GENERAL PUMP COMPANY, INC.
Contract #
A-2021-161-01
Agency
Public Works
Council Approval Date
8/17/2021
Expiration Date
8/16/2024
Destruction Year
2029
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />RFP NO.; 21-059 <br />WATER WELL, PUMP AND MOTOR REHABILITATION AND REPAIR SERVICES <br />testing, well casing patches and similar casing repairs/improvements, and mechanical treatment on well <br />casings, All chemicals used in treating wells shall be State approved for the purpose intended, must be <br />National Sanitation Foundation (NSF) approved, and Public Works approved for quantity and concentration. <br />Disinfection of the wells is required in accordance with American Water Works Association (AWWA) C654 — <br />Standard Disinfection of Wells, <br />The Contractor's estimates shall include the type and concentration of chemicals (acids, inhibitors, <br />Polymers, neutralizers, etc.) to be used; the typical appropriate contact time for the chemicals; and the <br />typical procedure for introducing, mixing, and neutralizing chemicals in the well. In addition, the name(s) <br />and phone numbers of any company(ies) that will supply the treatment chemicals shall be provided. <br />Completed Material Safety Data Sheets (MSDS) for all chemicals used shall include the methods of <br />mechanical treatment (dual swab, wlre/nylon brush, sonar jetting, etc,), <br />The Contractor shall perform wire brushing and it shall be carried out in manner as to clean the casing <br />louvers/perforations and to remove scale and tubercles attached to the wall of the casing, After wire brushing, <br />the well shall be allowed to sit for 24 to 48 hours and sediment fill shall be removed from the bottom of the <br />well to the maximum extent possible using a bailer or scow or equivalent retrieval device. <br />All bailed material (water and sediment) shall be placed in steel drums or appropriate containers. The <br />sediment, after separation from the water, shall be placed In the containers, properly labeled, and eventually <br />removed from the well site for disposal by the Contractor. All bailed material shall be properly disposed <br />of by the Contractor. <br />5. PUMP AND MOTOR REHABILITATION SERVICE <br />The Contractor shall provide rehabilitation services when requested by the City, The Contractor shall <br />rehabilitate of one or more of the following pump units: <br />Submersibles <br />Horizontal split case <br />Vertical turbines <br />Rehabilitation of all pumps and motors may Include, but not limited for <br />• Line shafts <br />• Bearings <br />• Right -angle -gears <br />• Housing/frame <br />• Column pipe <br />• Seals <br />• Impellers <br />• Rotor shaft <br />• Power/control cable attachments <br />• Thermal/moisture sensors <br />• Vibrational analysis (include report) <br />• All other appurtenant components <br />Upon request, the Contractor shall submit a written proposal to the City for the services described herein. <br />The Contractor shall also include the performance pump curves, manual specifications, and detailed <br />information regarding the new proposed pump and motor within the proposal package. The Contractor <br />
The URL can be used to link to this page
Your browser does not support the video tag.